
Technical data and performance
Technical data
Performance
Nominal heat output
18.27 kW
Space heating output
2.16 kW
Water heating output
16.11 kW
Reduced heat output
9.79 kW
Operating water pressure
1.5 bar
Test water pressure at installation
3.0 bar
Maximum operating temperature
85
°
С
Distance to adjacent combustible materials
side
= 400 mm
rear
= 400 mm
in front = 800 mm
Efficiency
92.4 %
СО emissions *13% О
2
]
at nominal heat output
at reduced heat output
0.0132 %
0.0512 %
Flue gases temperature
at nominal heat output
at reduced heat output
108
°
С
77
°
С
Flue gases mass
at nominal heat output
at reduced heat output
12.23 gr/s
8.46 gr/s
Draught
at nominal heat output
at reduced heat output
10.5 Ра
10.0 Pa
Duration of combustion
at nominal heat output
at reduced heat output
4.9 h
17.5 h
Fuel consumption minimum / maximum
2.3 / 4.3 kg/h
Type and dimensions of fuel
Wood pellets, Ø 6 mm/length 25 mm / class A1
Integral boiler capacity
22 l
Expansion vessel capacity
8 l
Cold and hot water inlets dimensions
3/4"
Pellet fuel hopper capacity
26 kg
Flue socket diameter
Ø 80 mm
Heating volume
≈ 470 m
3
Net weight
268 kg
The dimensions of the heated room are calculated based on pellets calorific value not less than 4300 ccal/kg and heat loss of
heated room 33 ccal/m³h. Consideration must be given the capacity of the radiators in the system and the availability of external
devices that can influence the operation of the pellet stove.
All activities for repairing of electrical components, maintenance and / or inspections should be performed by
qualified personnel. Unplug the appliance from the main electrical supply before you start these activities.
Electrical data:
Performance:
Power supply
230 Vac (+/-10%), 50 Hz
Switch on / off
Yes
Average power consumption
156 W
Average power consumption during ignition
375 W
Remote control / frequency remote control
Frequency 2.4 GHz / infrared
Main power protection
Fuse 4А, 250 VAC5 х 20
Control unit
Fuse 4А, 250 VAC5 х 20
We reserve the right to make changes to the products without prior notice, in order to improve
their performance.