
OPERATION
4-2
Manual No. 0-5133
ULTRA-CUT 200
4.02 Start-Up Sequence
1
. Connect system to primary input power.
2. Turn ON/OFF switch to ON (up) position.
AC Indicator
turns ON after about 5 seconds.
POWER
ON
OFF
O
I
OFF
O
Art # A-04812
3. Check the AC indicator. If the inverter modules are correctly configured for the input voltage and the switch is
ON, then voltage has been applied to the inverter modules (input contactors are ON). If the indicator does not
light after a few seconds disconnect power and check that each inverter is correctly configured for the input
voltage and all 3 phases are present. Check Status Indicator for any codes that can help. Once it is determined
that input is OK, it is necessary to select and load a process.
4.03 TSC-3000 Navigation Functions
SAMPLE
SAMPLE
System Status:
IDLE
-
+
DISPLAYS SYSTEM STATUS IN ALL SCREENS
BACK BUTTON
:
REVERSES TO THE PREVIOUS PAGE
INCREMENTS
/
DECREMENTS THE
SELECTED VALUE
OK / NEXT BUTTON
:
ACCEPTS ENTRIES AND MOVES TO THE
NEXT PAGE
PAGE HEADER
SELECTION NAVIGATION
:
MOVES CURSOR / SELECTION UP
AND DOWN ON THE PAGE OR
SCROLLS TEXT IN DIALOG BOX
WINDOW
A
r
t # A-09158
Содержание ULTRA-CUT 200
Страница 4: ...Thispageintentionallyblank...
Страница 8: ...NOTE Section 8 Torch operation is provided separately...
Страница 16: ...ULTRA CUT 200 1 8 Manual 0 5133...
Страница 26: ...Manual No 0 5133 Ultra Cut 200 2 10 SPECIFICATIONS This Page Intentionally Blank...
Страница 53: ...Manual No 0 5133 3 27 INSTALLATION ULTRA CUT 200 Art A 09151 After...
Страница 128: ...Manual No 0 5133 Ultra Cut 200 6 30 Power Supply Parts List ULTRA CUT 200 Intentionally Blank...
Страница 134: ...TORCH INFORMATION 7 6 Manual 0 5056 Ultra Cut 200 ULTRA CUT 200 This page is blank intentionally...
Страница 167: ...This Page Intentionally Blank...