5.
Close the water supply’s main control valve.
6. ACTIVATE THE ELECTRICAL PORTION OF THE
SYSTEM TO ENERGIZE THE SOLENOID.
7.
Open the inspector’s test connection to simulate an
open sprinkler. This can also be done by opening the sys-
tem main drain valve, as shown above.
8.
Record the system air pressure when the valve actu-
ates.
9.
Confirm that the piston charge line pressure drops to
zero and that water is flowing through the auto drain to
the drip cup.
10.
Confirm that the water supply’s main control valve is
closed.
11.
Close the system main drain valve.
12. SHUT OFF THE AIR SUPPLY.
13.
Close the piston charge line ball valve.
14.
Perform all steps in the “Placing the System in Ser-
vice” section, starting on page 11.
Full Trip Test
Victaulic recommends full trip testing every three years.
This test allows a full flow of water into the sprinkler sys-
tem; therefore, this test must be performed in warm
weather when there is no chance of freezing conditions.
NOTE:
The authority having jurisdiction in your area
may require that you perform this full trip test on a more
frequent basis. Verify these requirements by contacting
the authority having jurisdiction in the affected area.
1
. Notify the authority having jurisdiction, remote station
alarm monitors, and those in the affected area that the full
trip test will be performed.
2.
Record the water supply pressure and system air pres-
sure.
Water Supply's
Main Control
Valve
System Main
Drain Valve
Water Supply's
Main Control
Valve
System Main
Drain Valve
Piston
Charge Line
Ball Valve
DISCONTINUED
PRODUCT