8
3. Basic Operations
3.1 Installation
1
Positioning the measurement pan
First, mount the pan base on the
main unit of the balance and place
the measurement pan on top of it.
2
Securing the exact level of the balance
Turn the adjusters until the bubble
rests in the center of the red circle
on the level.
<Caution>
Use caution when operating the
adjusters on the square-pan type to
prevent them from lifting up.
3
Connecting the AC adapter
Connect the AC adapter to the
balance, as illustrated at left.
※
Take 5 minutes before operation.
<Caution>
If the balance has the battery
installed, refer to “11. Operating the
Balance with the Battery,” on page
39.
Position of air bubble
in the level
Содержание AJ-CESeries
Страница 2: ......