
NSC-200 User Guide
22162977
July 2022
87
Chapter
3 OneCheck Testing
Delayed Start testing
The
Delayed Start
feature allows a pre-configured test to be started with the physical
Play
button on the NSC-200, even if the NSC is not connected to the mobile device via Bluetooth.
1. With the NSC connected to the mobile device, configure the test you want to run, and
press
Delayed Start
. The NSC will pause until ready to test.
2. Press the
Play
button on the NSC to start the test. It is not necessary to be connected
to the mobile device to start. See the screen below for more detail.
Progress of the test can be monitored by observing the LED indicators on the NSC.
Test results will be displayed on the mobile device when it is connected, or
re-connected, to the NSC.
Delayed
Start
Play
button
Содержание NSC-200
Страница 1: ...NSC 200 Network Service Companion User Guide...
Страница 10: ...NSC 200 User Guide 22162977 July 2022 10 Contents...
Страница 16: ...NSC 200 User Guide 22162977 July 2022 16 About this Guide...
Страница 67: ...NSC 200 User Guide 22162977 July 2022 67 Chapter 2 Meter Setup...
Страница 68: ...NSC 200 User Guide 22162977 July 2022 68 Chapter 2 Meter Setup...
Страница 88: ...NSC 200 User Guide 22162977 July 2022 88 Chapter 3 OneCheck Testing...
Страница 96: ...NSC 200 User Guide 22162977 July 2022 96 Chapter 4 Data Testing...
Страница 107: ......