![VIASYS Vmax Encore Скачать руководство пользователя страница 62](http://html.mh-extra.com/html/viasys/vmax-encore/vmax-encore_technical-reference-manual_1011585062.webp)
Chapter 3 Maintenance and Troubleshooting
3–8
L2707
Technical Reference Manual
Vmax Encore
b. Select valve
L
(DLCO). Turn DLCO Supply OFF. Pressure should not drop by more than
100 PSI, within 2 minutes. If so, locate source of leak and correct.
c. Turn DLCO supply ON when Leak Test is verified to be OK.
3.
Calibration Gas 1 & 2 Leak Test:
a. Turn Cal Gas 1 supply ON and adjust regulator to 50 PSI.
b. Turn Cal Gas 1 Supply OFF. Pressure should not drop by more than 100 PSI, within 2
minutes. If so, locate source of leak and correct.
c. Turn Cal Gas supply ON when Leak Test is verified to be OK.
d. Perform same operation for Cal Gas 2 supply.
MASS FLOW SENSOR BOARD ADJUSTMENT PROCEDURES
The test points and adjustment potentiometers for the procedures listed below are located on the
Mass Flow Sensor Board. The voltages can be monitored with a voltmeter at the designated test
points or by viewing the voltages on the Diagnostics Test screen.
Figure 3-4 Vmax Program Manager Screen with Diagnostics selected
Содержание Vmax Encore
Страница 1: ...L2707 Rev A 2005 VIASYS Respiratory Care Inc Technical Reference Manual Vmax Encore ...
Страница 4: ...Vmax Encore Technical Reference Manual iv L2707 ...
Страница 6: ...Vmax Encore Technical Reference Manual vi L2707 ...
Страница 26: ...Vmax Encore Technical Reference Manual 1 20 L2707 ...
Страница 54: ...Vmax Encore Technical Reference Manual 2 28 L2707 ...