43
Intended for the contractual service organisation
VIADRUS a.s.
Bezru
č
ova 300
735 81 Bohumín
Guarantee certificate and Quality and completeness certificate for
Hefaistos P1 boiler
Boiler serial number
..............................……….
Boiler output
...........................................
User (Surname, name)
………………………………………………………………………………………
Address (street, city, postcode) ………………………………………………………………………………………
Tel/Fax
………………………………………………………………………………………
Boiler complies with requirements
EN 303-5
Heating boilers – Part 5: Heating boilers for solid fuels, hand and automatically stocked,
nominal heat output of up to 300 kW – Terminology, requirements, testing and marking
VIADRUS a.s. provides the guarantee:
–
for the boiler during 24 months after it was put into operation, but at the most 30 months after the boiler
was dispatched from the production plant
–
for the boiler drum during 5 years after it was dispatched from the production plant
Conditions of the warranty:
•
Installation of boiler must be carried out according to "Manual for boiler operation and
installation" by a professional installation company
•
Commissioning must be carried out according to "Manual for boiler operation and installation"
contractual service organization accredited by the manufacturer
•
Faults must be removed by a contractual service organization accredited by the manufacturer
Completeness of the boiler delivery is guaranted by the vendor
Warranty is void if not filled out
User confirms that:
•
the boiler adjusted by the professional installation company did not show any fault during the heating test
•
he received the "Manual for boiler operation and installation " with the duly completed guarantee
certificate and certificate of quality
•
he was acquainted with the operation and maintenance of boiler
……………………………………..
……………………………………..
……………………………………..
Manufacture date
Manufacturer’s stamp
Controlled by (signature)
……………………………………..
……………………………………...
……………………………………..
Date of installation
Installation company
(stamp, signature)
User’s signature
…………………………………….
……………………………………..
……………………………………..
Date of putting into operation
Contractual service organization
(stamp, signature)
User’s signature
Содержание Hercules P 1
Страница 1: ...Hercules U26 Návod k obsluze Hefaistos P 1 MANUAL FOR BOILER OPERATION AND INSTALLATION ...
Страница 44: ...44 ...
Страница 46: ...46 ...
Страница 47: ...47 ...
Страница 48: ...48 Update Date 42 2012 GB ...