12
Location of boiler with regard to
necessary handling space:
−
at least 1000 mm handling space must
be left in front of the boiler;
−
the minimum distance between the rear
part of the boiler and wall is 400 mm;
−
on both sides keep the space at least
400 mm for access to the rear part of the
boiler.
Fuel location:
−
it is forbidden to store the fuel behind or
next to the boiler in a distance lower
than 400 mm;
−
it is forbidden to store the fuel between
two boilers in boiler-room;
−
it is recommended by the manufacturer
that minimum distance of 1000 mm
−
is maintained between the boiler and
fuel or the fuel should be stored in
another room.
Fig.no. 7
Location of boiler in boiler room
A continuous air supply for burning and eventual ventilation must be ensured for the room where the
boiler is installed.
Air consumption of boiler:
Number of sections
3
4
5
6
7
Air cinsumption
[m
3
.h
-1
]
100
140
170
285
390
The choice of the right size of boiler
The choice of the right size of boiler i.e. its heat output is very important condition for economic operation
and a correct function of the boiler. The boiler must be chosen so that its rated thermal output corresponds to
the heat losses of the building. The rated output is calculated according to valid standards for outside
temperatures –12 °C, -15 °C and –18 °C. The choice of boiler with too high rated output (oversizing) results
in increased tarring and retting of the boiler. That’s why it is not suitable to use boilers with the output higher
than the heat losses of the building
This does not apply in case the boiler is connected in the system with a storage tank.
Chimney draught
The chimney with its proper draught is a fundamental prerequisite for a good function of boiler. It influences
both boiler output and its efficiency. The boiler may be connected to chimney vent which has a sufficient
draught (see chapter 2.3) and the revision must be carried out by an authorized organization.
Содержание Hercules P 1
Страница 1: ...Hercules U26 Návod k obsluze Hefaistos P 1 MANUAL FOR BOILER OPERATION AND INSTALLATION ...
Страница 44: ...44 ...
Страница 46: ...46 ...
Страница 47: ...47 ...
Страница 48: ...48 Update Date 42 2012 GB ...