16
1
filling and drain valve G 1/2“
2
shell with ventilator
3
return water input (with distribution pipe)
4
boiler plug 1/2“
5
sleeve 1 1/2“
6
heating water output
7
boiler plug 1/2“
8
two-way safety valve DBV 1 – 02
9
interconnecting hose 3/4“
10 air-release valve 1/2“
11 pipe-output
12 long bend 1 1/2“
13 T-joint 1 1/2“
14 interconnecting hose 1 1/2“
15 draught controller
16 adaptor reduced 1 1/2“ na 3/4“
Fig.no. 9a)
Installing the boiler drum – Hefaistos P1 T
Содержание Hercules P 1
Страница 1: ...Hercules U26 Návod k obsluze Hefaistos P 1 MANUAL FOR BOILER OPERATION AND INSTALLATION ...
Страница 44: ...44 ...
Страница 46: ...46 ...
Страница 47: ...47 ...
Страница 48: ...48 Update Date 42 2012 GB ...