3.5
Installation process
3.5.1 Installing the boiler drum
3.5.1.1 Installing the boiler drum – Hefaistos P1 T (see Fig. no. 8 and 9)
1.
Set the boiler drum on the socle (underlay).
2.
Dismount the rear part of the shell (1) by means of 4,8 x13 screws and serrated lock washers 5,3 - see
detail A and the upper part of the shell (2) according to the Figure no.8.
3.
Install T- joint (13), the reduced adaptor (16) into T- joint, then mount the long bend (12) and the
interconnection pipe G 1 ½“ (14) via sealing 1 ½“ according to the Fig. no.9a.
4.
Install the outlet pipe. Install the air-release valve (10) and two-way safety valve DBV 1 – 02 (8) to the
heating water outlet (6) (see Fig. no. 9a, 14, 15) – the valve can be installed only in the horizontal
position. The heating water outlet pipe (6) must be connected via a demountable joint to the heating
system.
5.
The return water inlet (3) must be connected via a demountable joint to the heating system.
6.
Install the filling and drain valve G 1/2“ (1).
7.
Install the control box see chap. no. 3.5.2.
8.
Screw the draft controller (15) into the opening in the reduced adaptor (16). The procedure of setting the
boiler draft controller is shown in chapter no.5.1.1-Operation.
9.
Put the smoke pipe on the exhaust ventilator (2) and push it into the chimney hole. The smoke pipe
diameter is stated in tab. No.1.
3.5.1.2 Installing the boiler drum – Hefaistos P1 E (see Fig. no. 8 and 9)
1.
Set the boiler drum on the socle (underlay).
2.
Dismount the rear part of the shell (1) by means of 4,8 x13 screws and serrated lock washers 5,3 - see
detail A and the upper part of the shell (2) according to the Figure no.8.
3.
Install T- joint (13), the radiator plug (15) into T- joint, then mount the long bend (12) and the
interconnection pipe G 1 ½“ (14) via sealing 1 ½“ according to the Fig. no.9b.
4.
Install the outlet pipe. Install the air-release valve (10) and two-way safety valve DBV 1 – 02 (8) to the
heating water outlet (6) (see Fig. no. 9b, 14, 15) – the valve can be installed only in the horizontal
position. The heating water outlet pipe (6) must be connected via a demountable joint to the heating
system.
5.
The return water inlet (3) must be connected via a demountable joint to the heating system.
6.
Install the filling and drain valve G 1/2“ (1).
7.
Install the control box see chap. no. 3.5.2.
8.
Put the smoke pipe on the exhaust ventilator (2) and push it into the chimney hole. The smoke pipe
diameter is stated in tab. No.1
Содержание Hercules P 1
Страница 1: ...Hercules U26 Návod k obsluze Hefaistos P 1 MANUAL FOR BOILER OPERATION AND INSTALLATION ...
Страница 44: ...44 ...
Страница 46: ...46 ...
Страница 47: ...47 ...
Страница 48: ...48 Update Date 42 2012 GB ...