25
10
Delivery and assembly
10.1
Delivery and accessories content
The boiler is supplied in an assembled state on a pallet and is protected by a foil.
Standard accessories for all versions of the boiler:
Conductor inlets PG 9 4 pcs
Conductor inlets PG 11 4 pcs
Blind flanges PG 9 4 pcs
Blind flanges PG 11 4 pcs
Automatic air-relief valve 1 pc
TE joint -
reduced 90° 1 x 1/2“ 2 pcs
Discharge valve 1 pc
Retaining plate 425315 REGULUS
1 pc
Screw F/H 4,8 x 13
1 pc
sect.
2
3
4
5
screw M4 x 8
pcs
5
5
5
7
washer
4.3
pcs
10
10
10
14
nut M 4
pcs
5
5
5
7
Brush for boiler drum mechanical cleaning
1 pc
Manual for boiler operation and installation containing a
warranty certificate
By request:
VIADRUS OV 100L stack heater
-
Honeywell V 4044F three-way valve (for preferential hot
water heating)
-
Grundfos UPS 25-40 circulation pump (fig. 22)
-
Js 1
“ backflow valve with a flange for pump
connection
-
Js 1
“ spheric valve with a flange for pump
connection
-
Pump thermostat
OSV flue-gases ventilator incl. optional accessories (types
specification according to tab. No. 6):
-
R 60/80
Adapter
60 /80 (standard part of OSV
delivery)
-
T 80
Pipe 76/80
– 1 m with sealing
-
T 80/T1
Pipe 76/80
– 0,93 m without sealing
-
T 80/T0,5
Pipe 76/80
– 0,5 m without sealing
-
K 45
Elbow 45° O/M - with sealing
-
K 90
Elbow 90° O/M - with sealing
-
O 90
Bend 90° (Rs 100) M/M - with sealing
-
TK 80
Pipe 1 m with an end piece
-
M 80
Internal, external cuff
-
134 B
Slip-
on head (through the roof) ø 80x174
Regulation according to purchase order specification code:
-
Space thermostat CM 707
-
Outdoor thermostat REGO type 95001 (for boiler
equipped with 2° gas valve)
Boiler equipment ordered "by request" is not included to the basic price of the boiler
.
Fig. №. 22
Connection of the pump thermostat - delivery "by request"
10.2
Mounting procedure
1.
Put the boiler on the required standpoint
(it is necessary to respect the demands on boiler positioning stated in chapter 9.2)
according to the project documentation
. We recommend transporting the boiler to the determined standpoint on a pallet, preferably
still wrapped in protective packing. If this is not possible due to the lack of space, convey the boiler without the packing holding it by its
base plate.
In no case is allowed to lift the boiler by the heating water pipe or the gas pipe.
The boiler has to stay firmly on a non-
flammable pad in the vertical position and has to be sufficiently balanced.
2.
Mount the TE branch,
to the heating water output,
mount the discharge valve
to the heating water input,
mount the automatic air-
relief valve
to the heating water output (fig. No. 23). The parts are delivered with the boiler.
3.
Connection to the heating system
is to be performed according to the project documentation.
4.
Assemble the horizontal draught diverter, mount the sensor of the flue gases reverse flow safety device.
The parts are delivered
with the boiler.
5.
It is forbidden to exclude from operation the flue gases reverse flow safety device. It is forbidden to intervene unprofessionally
into the flue gases reverse flow safety device. To mount the flue gases reverse flow safety device and replace their defect parts,
only original parts delivered by the manufacturer must be used.
6.
Perform connection to the chimney.
7.
Perform installation of the water heater (if required).
To ensure preferential hot water heating, we recommend using the
Honeywell V
4044F
three-way valve. Mount a backflow valve between the pump and the three-way valve. During mounting, it is necessary to observe
the direction of connection according to the designation on this valve.
Fig. No.21 shows the valve in a position when the heating water supply to the heating system is opened. In case of requirements for
domestic hot water, the output "B" into the heating system is automatically closed and the output "A" into the reservoir is opened.
The valve has to be mounted in the position shown in fig. No. 25 and 26.
During mounting, no rotation of the valve is allowed!
8.
Connecting the boiler to the gas connection.
Connecting gas to the boiler
by means of a spherical shut-off valve.
9.
Release the air-relief screw of the automatic air-relief valve.
It must be released at water filling into the heating system, as well as
during boiler operation.
CIRCUIT DIAGRAM:
CONNECTION DIAGRAM:
Содержание GARD G42 ECO
Страница 1: ...GB_2018_03...
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 44: ......