background image

 

23 

 

Positioning and installation 

9.1 

Regulations and directives 

Boiler  can be installed by a company holding a valid license to install and maintain the gas appliances.  A project according to the 
valid regulations must be prepared for installation. 
The  heating  system  has  to  be  filled  up  with  water,  which  complies  with  requirements  of  ČSN  07  7401,  and  mainly  its  hardness 
mustn't exceed the required parameters. 

Tab. №. 8 

 

Recommended values 

Hardness 

mmol/l 

Ca

2+

 

mmol/l 

0.3 

Concentration of total Fe + Mn 

mg/l 

(0,3)* 

*) recommended values 

WARNING!!! The manufacturer doesn't recommend using of antifreeze mixtures.  

a) for the heating system  

ČSN 06 0310 

Heat systems in buildings 

– Design and mounting 

ČSN 06 0830 

Heat systems in buildings 

– Securing devices 

ČSN 07 7401 

Water and steam for heat energetic equipment with steam operation pressure up to 8 MPa 

ČSN EN 297 

Gas  fuel  boilers  for  central  heating 

– Type B11 and B11BS fitted with atmospheric burners of nominal heat 

input not exceeding 70 kW. 

b) for  the chimney 

ČSN 73 4201 

Design of chimneys and flue gas ducts 

– Design, fulfillment and connection of fuel consumers 

c) regarding to fire-fighting regulations 

ČSN 06 1008 

Fire safety of heat equipment. 

ČSN EN 13501-1 + A1 

Fire  classification of building products and building structures 

– Part 1: Classification according to results of 

tests for reaction to fire 

d) for the hot water heating system 

ČSN 06 0320 

Heat systems in buildings 

– Preparation of hot water – Development and design 

ČSN 06 0830 

Heat systems in buildings 

– Securing devices 

ČSN 75 5409 

Indoor water distributions 

e) for electric network 

ČSN 33 0165 

Electric-technical regulations. Conductors designation with colors or numbers. Execution of provisions. 

ČSN 33 1500 

Electric-technical regulations. Revisions of electric devices. 

ČSN 33 2000-1 ed. 2 

Low voltage electric installation 

– Part 1. Basic aspects, determination of basic characteristics, definitions. 

ČSN 33 2000-4-41 ed. 2 

Low voltage electric installation 

– Part 4-41: Protective measures for provision of safety - Protection against 

electric shock. 

ČSN 33 2000-5-51 ed. 3 

Low  voltage  electric  installation 

–  Part  5-51:  Selection  and  construction  of  electric  devices  –  General 

regulations 

ČSN 33 2130 ed. 2 

Low voltage electric installation 

– Inside electric distributions. 

ČSN 33 2180 

Electric-technical regulations. Connection of electric devices and consumers. 

ČSN 34 0350 ed. 2 

Safety requirements for movable power supplies and cords. 

ČSN EN 60079-10-1 

Explosive atmospheres 

– Part 10-1: Determination of dangerous premises – Explosive gaseous atmospheres 

ČSN EN 60079-14 ed.3 

Explosive atmospheres 

– Part 14: Development, selection and performance of electric installations 

ČSN EN 60335-1 ed.2 

Electric consumers for household and similar purpose 

– Safety – Part 1: General requirements 

ČSN EN 60335-2-102 

Electric  consumers  for  household  and  similar  purpose 

–  Safety  –  Part  2-102:  Special  requirements  for 

consumers combusting gaseous, oil and solid fuels, containing electric connections. 

ČSN EN 60 445 ed. 4  

Basic  and  safety  principles  for  the  human-machine  interface,  marking  and  identification 

–  Identification  of 

clamps of subjects, ends of conductors and conductors  

f) for gas distribution 

ČSN EN 1775 

Gas supply - Gas pipelines in buildings - Maximal operation pressure <= 5 bar - Operation requirements. 

ČSN EN 12007-1 

Equipment  for  gas  supply  -  Gas  pipeline  with  maximal  operation  pressure  up  to  16  bar  including  -  Part  1: 
General functional requirements 

ČSN EN 12007-2 

Equipment  for  gas  supply  -  Gas  pipeline  with  maximal  operation  pressure  up  to  16  bar  including  -  Part  2: 
Specific functional requirements for polyethylene (maximal operation pressure up to 10 bar including)  

ČSN EN 12007-3 

Equipment  for  gas  supply  -  Gas  pipeline  with  maximal  operation  pressure  up  to  16  bar  including  -  Part  3: 
Specific functional requirements for steel  

ČSN EN 12007-4 

Equipment  for  gas  supply  -  Gas  pipeline  with  maximal  operation  pressure  up  to  16  bar  including  -  Part  4: 
Specific functional requirements for reconstruction  

ČSN 38 6405 

Gas equipment. Principles for operation. 

Law 458/2000 Sb. 

Law on conditions of enterpreneurship and on execution of public administration in energetic branches and on 
changes of some laws (the Energetic law) 

 

Содержание GARD G42 ECO

Страница 1: ...GB_2018_03...

Страница 2: ...ment 24 10 Delivery and assembly 25 10 1 Delivery and accessories content 25 10 2 Mounting procedure 25 11 Commissioning instructions for contractual service organizations 27 11 1 Verification activit...

Страница 3: ...s it is equipped with a safety device for prevention of flue gas reverse motion A two sections and three sections design is suitable for reconstruction of heat sources in separate dwelling units for s...

Страница 4: ...ating power kW 8 12 17 18 26 22 30 Weight kg 75 100 122 146 Water content l 7 9 2 11 4 13 6 Chimney throat diameter mm 80 110 130 160 Boiler sizes width mm 335 420 505 590 depth x height mm 758 957 Op...

Страница 5: ...ing of the boiler is painted with high quality komaxit painting The atmospheric burner consisted of low emission oval shaped burner pipes of new type is made of anti corrosion steel with high operatio...

Страница 6: ...cladding 10 cladding rear part 11 electric panel bracket 12 electric panel 13 safety flue gases thermostat 14 safety operational thermostat 15 boiler thermostat with a turning knob 16 thermo manomete...

Страница 7: ...the safety and boiler thermostats eventually the pump thermostat of the thermometer are placed in the well of the left outer section and the back pressure valve that is placed in the upper part of the...

Страница 8: ...tion pilot burner is not combusted during the safety time Ts 55 s Ts 25 s SIT Ts 60 s then the blocking automatics will be connected If flame is extinguished during normal operation the igniting autom...

Страница 9: ...LURE SIGNALLING B 1 SAFETY THERMOSTAT BT4 BOILER THERMOSTAT BT6 OUTDOOR THERMOSTAT S2 LOW NOMINAL POWER SWITCH Y3 2 VALVE COIL M9 EXHAUSTING VENTILATOR E1 IGNITION ELECTRODE E2 IONIZATION ELECTRODE Y1...

Страница 10: ...way valve Circulation pump Valve 2 coil Circulation pump thermostat DHW heater thermostat Room thermostat ELECTRIC PANEL Conductors colors GNYE yellow green RD red BK black BN brown BU blue LEGEND Z1...

Страница 11: ...K 4100 Q 2003 B GAS VALVE E1 IGNITING ELECTRODE E2 IONIZATION ELECTRODE BT2 FLUE GASES THERMOSTAT BT1 SAFETY THERMOSTAT BT4 OPERATION THERMOSTAT S1 MAIN SWITCH H1 BOILER UNDER VOLTAGE SIGNALLING H2 FA...

Страница 12: ...AFETY THERMOSTAT BT4 BOILER THERMOSTAT BT6 OUTDOOR THERMOSTAT S2 LOW NOMINAL POWER SWITCH Y3 2 VALVE COIL M9 EXHAUSTING VENTILATOR E1 IGNITION ELECTRODE E2 IONIZATION ELECTRODE Y1 VK 4100 Q 2003 B GAS...

Страница 13: ...entilator Three way valve Circulation pump Circulation pump thermostat DHW heater thermostat Room thermostat ELECTRIC PANEL Conductors colors GNYE yellow green RD red BK black BN brown BU blue LEGEND...

Страница 14: ...AUTOMATICS Y1 VK 4100 A 1002 GAS VALVE E1 IGNITING ELECTRODE E2 IONIZATION ELECTRODE BT2 FLUE GASES THERMOSTAT BT1 SAFETY THERMOSTAT BT4 OPERATION THERMOSTAT S1 MAIN SWITCH H1 BOILER UNDER VOLTAGE SI...

Страница 15: ...IGNALLING B 1 SAFETY THERMOSTAT BT4 BOILER THERMOSTAT BT6 OUTDOOR THERMOSTAT S2 LOW NOMINAL POWER SWITCH Y3 2 VALVE COIL M9 EXHAUSTING VENTILATOR E1 IGNITION ELECTRODE E2 IONIZATION ELECTRODE Y1 SIGMA...

Страница 16: ...way valve Circulation pump Valve 2 coil Circulation pump thermostat DHW heater thermostat Room thermostat ELECTRIC PANEL Conductors colors GNYE yellow green RD red BK black BN brown BU blue LEGEND Z1...

Страница 17: ...GMA 843 GAS VALVE E1 IGNITING ELECTRODE E2 IONIZATION ELECTRODE BT2 FLUE GASES THERMOSTAT BT1 SAFETY THERMOSTAT BT4 OPERATION THERMOSTAT S1 MAIN SWITCH H1 BOILER UNDER VOLTAGE SIGNALLING H2 FAILURE SI...

Страница 18: ...boiler with an equitherm regulator the pump operation is controlled according to the regulator program Fig 14 Characteristics of Wilo Yonos Para RS 15 7 5 pump 7 Stack heaters for domestic hot water 7...

Страница 19: ...lower supply rate the heating time of domestic hot water will be longer Important warning Set the heater thermostat at the maximum temperature of 60 C remark Regulations in Czech Republic do not allo...

Страница 20: ...anometer probe well 10 support 11 side wall part of the cladding 12 rear part of the cladding 13 electric panel bracket 14 upper part of the cladding 15 front part of the cladding 16 heating water out...

Страница 21: ...o fig 19 provided the boiler is designed so that it complies with observation of the maximum height of H 1 5 m and calculations according to table No 7 The pressure loss is minimum in this design Fig...

Страница 22: ...80 1 m with sealing 1 K 45 Elbow 45 O M with sealing 2 5 K 90 Elbow 90 O M with sealing 3 O 90 Bend 90 Rs 100 O M with sealing 2 TK 80 Pipe of 1 m with an end piece 2 M 80 Internal external cuff R 60...

Страница 23: ...provision of safety Protection against electric shock SN 33 2000 5 51 ed 3 Low voltage electric installation Part 5 51 Selection and construction of electric devices General regulations SN 33 2130 ed...

Страница 24: ...s included in the reaction of fire extract from SN EN 13501 1 A1 A1 incombustible Granite sandstone concrete bricks ceramic tiles mortars fireproof plasters A2 hardly combustible Acumin izumin herakli...

Страница 25: ...ly still wrapped in protective packing If this is not possible due to the lack of space convey the boiler without the packing holding it by its base plate In no case is allowed to lift the boiler by t...

Страница 26: ...be deposited in the distributions or the heating radiators and consequently could cause a damage of the pump Water serving for watering the heating system has to be clean and colorless without suspen...

Страница 27: ...t is recommended to set temperature to 85 C heater thermostat if connected 0 90 C for a sufficiently fast hot water heating the TK boiler thermostat must be set to 85 C 3 Gas input pressure before ent...

Страница 28: ...iler 2 gas valve 1 Put the boiler into operation 2 Measure the gas input pressure 3 Before itself wait a while till operational pressure conditions on the burner are being stabled 4 If an outdoor ther...

Страница 29: ...lve is set by the manufacturer to the slowest start up see fig No 32 the MIN curve If you need to change the opening characteristics it is possible to perform setting according to the following points...

Страница 30: ...ure from the low to nominal value by means of an outdoor thermostat If the power switch is in the positions I the boiler in case of outdoor temperature higher than 0 C will be operated with the low po...

Страница 31: ...Check the burner tubes choking In case they are fouled dismount the ignition pilot burner Fig No 3 or 4 by means of a steel brush clean slightly the burner tubes perforation remove dust with help of...

Страница 32: ...bout 10 min 9 Don t put any objects made of flammable material on the boiler and within a distance smaller than the safe distance from it see chapter no 9 2 10 The user is obliged to put a professiona...

Страница 33: ...out in case of fine impurities the dimensions of which are the same as the filter mesh diameter the whole gas valve must be exchanged Boiler cannot be ignited the safety thermostat is switched off on...

Страница 34: ...operator VIADRUS a s provides an extended warranty period for the boiler drum of the boiler for 60 months from the sale date but not longer than 66 months from the dispatch date from VIADRUS a s The c...

Страница 35: ...wer and high temperature mode 4 90 93 At 30 of nominal heating power and low temperature mode P1 2 4 kW At 30 of nominal heating power and low temperature mode 1 89 21 Auxiliary electric energy consum...

Страница 36: ...d low temperature mode 1 90 69 Auxiliary electric energy consumption Other items At full load elmax 0 010 kW Heat loss in standby mode Pstby 0 099 kW At partial load elmin 0 003 kW Electric energy con...

Страница 37: ...d low temperature mode 1 90 79 Auxiliary electric energy consumption Other items At full load elmax 0 010 kW Heat loss in standby mode Pstby 0 095 kW At partial load elmin 0 003 kW Electric energy con...

Страница 38: ...and low temperature mode 1 90 76 Auxiliary electric energy consumption Other items At full load elmax 0 010 kW Heat loss in standby mode Pstby 0 114 kW At partial load elmin 0 003 kW Electric energy c...

Страница 39: ...tion of resources SN EN 13428 SN EN 13427 YES 2 Repeated use SN EN 13429 NO 3 Material recycling SN EN 13430 YES NO i 4 Energy evaluation SN EN 13431 YES NO a 5 The use by composting and biodegradatio...

Страница 40: ...ificate for the customer the user The record of performed warranty and after warranty repairs and regular annual checks of the product Record date Performed activity Contractual service organization s...

Страница 41: ......

Страница 42: ......

Страница 43: ......

Страница 44: ......

Отзывы: