background image

16 

-

 

service  thermostat  stage II.  

-

 

Safety  thermostat 

-

 

Service hours meters stage  I. and II. 

-

 

burner operation stage  I. and II. pilot lamps   

-

 

"defect" pilot lamp  - safety thermostat  switching on  

-

 

connecting terminal board  

 

„In case you require an equithermal regulation- OS 06 mounted in electric panel  - 
Manual for operation and installation  belongs to the delivery“. 

 
IMPORTANT WARNINGS  : 

1.

 

The boiler works automatically after its start up. It only can be operated by adults familiar with this manual  
and the burner operation manual.   

2.

 

The boiler must be operated according to manual and related standards. 

3.

 

Combustion air 

must not contain a high moisture and dust content. 

If it is impossible to prevent moisture 

and dust in environment where the boiler is installed, then  the combustion air must be brought to the 
boiler room directly from outdoor environment. 

4.

 

The boiler room must be kept clean and dustless.  

All sources of pollution must be removed from the 

boiler room and during the works producing dust (insulating works, boiler room cleaning), the boiler 
must be put out of operation. Even a partial dust deposit on burner will deteriorate the combustion 
process , jeopardize an economical and reliable   boiler operation.  

5.

 

In order to prevent boiler from dewiness followed by low-temperature corrosion in situations where  the 
boiler is operated at lower 

temperatures for a longer time  (transition periods, heating system with a 

large volume of heating water, low- temperature regime etc. ) it is necessary to ensure that the return 
water  temperature does not drop below 50 °C. Creation of boiler own circuit is the best solution. 

6.

 

Burner stage I. adjustment (reduced output) must be done with regard to flue gases temperature 
which shouldn’t be lower than 130°C. 

7.  Water from  boiler and heating system must never be discharged or taken for usage 

except for  the 

emergency cases like repairs etc. Water discharge and filling with new water increases the danger of 
corrosion and scale development.   
In case we have to refill  the heating system with water

 we only refill a  cold boiler 

in order to prevent 

the boiler sections from disruption.   

8.  In case of boiler failure state  

the burner defect pilot lamp in boiler electric panel is alight

.  

In case of 

electricity outage  the burner is switched off and will start automatically after voltage recovery in el. 
network.   

9.  The burners operation defects 

are described in detail in burners operation manual including the ways 

of their elimination and they have to be followed

 

 

10. 

In case of a  long-term boiler shutdown is put it must be disconnected from el. network. 

11. 

In case that it  has occurred the danger of combustible vapours or gases development and their 

penetration into the boiler room

 or at works with temporarily developed fire or explosion danger (flooring 

gluing works, painting works using the flammable paints, etc.), 

boiler must be shut down long enough before 

the works start. 

12. 

Don’t put any objects made of flammable materials on boiler and  within a distance smaller than the 

safe distance  from the boiler. 
13. 

The user is obliged to have the commissioning, regular maintenance and defects elimination done by 

professional contractual service accredited by  ŽDB a.s. Bohumín, Závod topená

ř

ské techniky VIADRUS, the 

boiler manufacturer , otherwise the guarantee for boiler proper function is void. „ VIADRUS G 700“ boiler 
quality and completeness certificate” after having been filled by contractual service organization serves as the 
“Guarantee certificate”.  
14. Once a year a regular maintenance must be done on boiler according to the next chapter. 

 

When these terms are not observed the guarantee repairs cannot be demanded. 

 

The list of contractual service organizations is enclosed separately.  

 8.  Maintenance 

 

If the burner is properly adjusted the flue gases generated by gaseous and liquid fuels don’t cause clogging 

of convection furnaces but after the heating season  the sediments must be removed from the boiler in order to 
maintain its efficiency.  

   

 

Содержание G 700

Страница 1: ...1 MANUAL for boiler operation and installation VIADRUS G 700...

Страница 2: ...k in low pressure boiler rooms Thereby a long time and trouble free boiler operation will be guaranteed to both your and our satisfaction VIADRUS G 700 boiler was approved to be operated in the Czech...

Страница 3: ...ts setting 15 7 2 Electric panel 15 8 Maintenance 17 9 Instructions for product disposal after its service life 17 10 Guarantee and liability for defects 18 Purchase order Purchase order specification...

Страница 4: ...ure at maximum 4 bar operating overpressure The boiler drum is tested by 8 bar testing overpressure Boiler advantages are as follows 1 Longstanding service life of cast iron boiler drum 2 Highly econo...

Страница 5: ...bar 0 9 1 4 2 2 3 2 5 6 2 Recommended chimney draught mbar min 0 2 Boiler water volume l 252 277 302 327 352 377 Pressure loss on water side dt 20 K mbar 0 9 1 35 1 9 2 6 3 34 4 2 dt 10 K mbar 3 4 3 9...

Страница 6: ...in combustion chamber The opening 126 mm in the upper part of the frontal section is closed by a flange with boring 3 x G 1 2 for the reservoir of thermostat safety thermostat and thermometer and the...

Страница 7: ...7 Fig no 1 Boiler assembly...

Страница 8: ...8...

Страница 9: ...onsole of shell 23 connecting console 24 side part of shell frontal left 25 side part of shell frontal right 26 side part of shell 27 side part of shell rear 28 frontal part of shell segment 2 right 2...

Страница 10: ...10 4 2 Electric wiring diagrams Fig no 2 Electric panel wiring diagram...

Страница 11: ...nalling MPH1 burner stage 1 service hours meter MPH2 burner stage 2 service hours meter BT3 burner stage 2 thermostat X20 burner connector NOTE Water pressure manostat PS1 only in design for MORA firm...

Страница 12: ...12...

Страница 13: ...13 Fig no 3 Electric panel wiring diagram...

Страница 14: ...ust be left a free handling space minimum up to the boiler depth 500 mm from one side 600 mm access to the back rear access 800mm and 500 mm between two boilers When installing the boiler we must cons...

Страница 15: ...8 MPa b regarding the gas distribution SN EN 1775 1999 Gas supply Pipelines in buildings Maximum service overpressure less than 5 bar SN 38 6413 1990 Gas conduits and connections with low and medium...

Страница 16: ...h and oak wood hobrex boards plywood werzalit umakart sirkolit C2 medium combustible Pinewood larch whitewood chipboard and cork boards rubber flooring C3 easily combustible Asphalt board fibreboards...

Страница 17: ...elements Setting of temperature stage I reduced output to 50 90 C range optionally 50 115 C Setting of temperature stage II nominal output to 50 90 C range optionally 50 115 C in low temperature regi...

Страница 18: ...e and filling with new water increases the danger of corrosion and scale development In case we have to refill the heating system with water we only refill a cold boiler in order to prevent the boiler...

Страница 19: ...ose all small covers closing plate burner plate with burner mount the holder with explosive flap and check them for tightness 9 Instructions for product disposal after its service life Because the pro...

Страница 20: ...by an authorized organization contractual service accredited by DB a s Bohum n Z vod topen sk techniky VIADRUS and the manufacturer of the burner being operated To document all records about carried o...

Страница 21: ...19...

Страница 22: ...11...

Страница 23: ...ts of shell 26 exhaust neck 27 manostat valve 28 reservoirs 29 electric panel cover 30 upper rear part of sh 31 insulation of upper part of shell 32 frontal upper part of shell 33 upper part insulatio...

Отзывы: