background image

11 

 

Содержание G 700

Страница 1: ...1 MANUAL for boiler operation and installation VIADRUS G 700...

Страница 2: ...k in low pressure boiler rooms Thereby a long time and trouble free boiler operation will be guaranteed to both your and our satisfaction VIADRUS G 700 boiler was approved to be operated in the Czech...

Страница 3: ...ts setting 15 7 2 Electric panel 15 8 Maintenance 17 9 Instructions for product disposal after its service life 17 10 Guarantee and liability for defects 18 Purchase order Purchase order specification...

Страница 4: ...ure at maximum 4 bar operating overpressure The boiler drum is tested by 8 bar testing overpressure Boiler advantages are as follows 1 Longstanding service life of cast iron boiler drum 2 Highly econo...

Страница 5: ...bar 0 9 1 4 2 2 3 2 5 6 2 Recommended chimney draught mbar min 0 2 Boiler water volume l 252 277 302 327 352 377 Pressure loss on water side dt 20 K mbar 0 9 1 35 1 9 2 6 3 34 4 2 dt 10 K mbar 3 4 3 9...

Страница 6: ...in combustion chamber The opening 126 mm in the upper part of the frontal section is closed by a flange with boring 3 x G 1 2 for the reservoir of thermostat safety thermostat and thermometer and the...

Страница 7: ...7 Fig no 1 Boiler assembly...

Страница 8: ...8...

Страница 9: ...onsole of shell 23 connecting console 24 side part of shell frontal left 25 side part of shell frontal right 26 side part of shell 27 side part of shell rear 28 frontal part of shell segment 2 right 2...

Страница 10: ...10 4 2 Electric wiring diagrams Fig no 2 Electric panel wiring diagram...

Страница 11: ...nalling MPH1 burner stage 1 service hours meter MPH2 burner stage 2 service hours meter BT3 burner stage 2 thermostat X20 burner connector NOTE Water pressure manostat PS1 only in design for MORA firm...

Страница 12: ...12...

Страница 13: ...13 Fig no 3 Electric panel wiring diagram...

Страница 14: ...ust be left a free handling space minimum up to the boiler depth 500 mm from one side 600 mm access to the back rear access 800mm and 500 mm between two boilers When installing the boiler we must cons...

Страница 15: ...8 MPa b regarding the gas distribution SN EN 1775 1999 Gas supply Pipelines in buildings Maximum service overpressure less than 5 bar SN 38 6413 1990 Gas conduits and connections with low and medium...

Страница 16: ...h and oak wood hobrex boards plywood werzalit umakart sirkolit C2 medium combustible Pinewood larch whitewood chipboard and cork boards rubber flooring C3 easily combustible Asphalt board fibreboards...

Страница 17: ...elements Setting of temperature stage I reduced output to 50 90 C range optionally 50 115 C Setting of temperature stage II nominal output to 50 90 C range optionally 50 115 C in low temperature regi...

Страница 18: ...e and filling with new water increases the danger of corrosion and scale development In case we have to refill the heating system with water we only refill a cold boiler in order to prevent the boiler...

Страница 19: ...ose all small covers closing plate burner plate with burner mount the holder with explosive flap and check them for tightness 9 Instructions for product disposal after its service life Because the pro...

Страница 20: ...by an authorized organization contractual service accredited by DB a s Bohum n Z vod topen sk techniky VIADRUS and the manufacturer of the burner being operated To document all records about carried o...

Страница 21: ...19...

Страница 22: ...11...

Страница 23: ...ts of shell 26 exhaust neck 27 manostat valve 28 reservoirs 29 electric panel cover 30 upper rear part of sh 31 insulation of upper part of shell 32 frontal upper part of shell 33 upper part insulatio...

Отзывы: