background image

17 

All skilled interventions can only be done by a professional contractual service organization trained by 

the manufacturer. 

 

Before the cleaning works you must disconnected the boiler from el. network and the burner from fuel 

supply, open the closing plate with burner, which makes the combustion chamber and convection parts 
chambers accessible for cleaning.  By using the brush remove the impurities from heat transfer  surfaces. For    a 
proper cleaning of vertical draughts between the rear and central sections  you must dismount 4 small covers for 
the purpose of cleaning.  This you can do after you have removed the upper and lower part of the rear shell. The 
remains after cleaning must be removed from  combustion chamber space, from exhaust neck and  flue gases 
collector- this after you have dismounted the holder with  explosive flap (you must not handle  the explosive flap 
and springs).  
 

After cleaning you must close all small covers, closing plate, burner plate with burner, mount the 

holder with explosive flap and check them for tightness.  

 

 
 

9. 

Instructions for product disposal after its service life  

 
Because the product is made of common metal materials its individual components are recommended to be 
disposed of as follows: 

- the exchanger  (grey cast-iron) through a firm dealing with waste collection and disposal   
- piping, shell   

through a firm dealing with waste collection and disposal   

- other metal parts 

 

through a firm dealing with waste collection and disposal   

- ROTAFLEX  insulation  material 

 

- into the common waste 

 

The boiler package should be disposed of in following way:  
-

 

plastic foil, cardboard package and wooden pallet into the common waste 

-

 

metal strap (for strapping) - through a firm dealing with waste collection and disposal   

 

In case that the product has lost its serviceability  you  can  advantage of product “take back service” ( if 
this is established);  in case that the originator has declared that  it is a scrap  it must be handled 
according to the valid  legislation of relevant country.   

 
 
 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
10. 

Guarantee and liability for defects 

Содержание G 700

Страница 1: ...1 MANUAL for boiler operation and installation VIADRUS G 700...

Страница 2: ...k in low pressure boiler rooms Thereby a long time and trouble free boiler operation will be guaranteed to both your and our satisfaction VIADRUS G 700 boiler was approved to be operated in the Czech...

Страница 3: ...ts setting 15 7 2 Electric panel 15 8 Maintenance 17 9 Instructions for product disposal after its service life 17 10 Guarantee and liability for defects 18 Purchase order Purchase order specification...

Страница 4: ...ure at maximum 4 bar operating overpressure The boiler drum is tested by 8 bar testing overpressure Boiler advantages are as follows 1 Longstanding service life of cast iron boiler drum 2 Highly econo...

Страница 5: ...bar 0 9 1 4 2 2 3 2 5 6 2 Recommended chimney draught mbar min 0 2 Boiler water volume l 252 277 302 327 352 377 Pressure loss on water side dt 20 K mbar 0 9 1 35 1 9 2 6 3 34 4 2 dt 10 K mbar 3 4 3 9...

Страница 6: ...in combustion chamber The opening 126 mm in the upper part of the frontal section is closed by a flange with boring 3 x G 1 2 for the reservoir of thermostat safety thermostat and thermometer and the...

Страница 7: ...7 Fig no 1 Boiler assembly...

Страница 8: ...8...

Страница 9: ...onsole of shell 23 connecting console 24 side part of shell frontal left 25 side part of shell frontal right 26 side part of shell 27 side part of shell rear 28 frontal part of shell segment 2 right 2...

Страница 10: ...10 4 2 Electric wiring diagrams Fig no 2 Electric panel wiring diagram...

Страница 11: ...nalling MPH1 burner stage 1 service hours meter MPH2 burner stage 2 service hours meter BT3 burner stage 2 thermostat X20 burner connector NOTE Water pressure manostat PS1 only in design for MORA firm...

Страница 12: ...12...

Страница 13: ...13 Fig no 3 Electric panel wiring diagram...

Страница 14: ...ust be left a free handling space minimum up to the boiler depth 500 mm from one side 600 mm access to the back rear access 800mm and 500 mm between two boilers When installing the boiler we must cons...

Страница 15: ...8 MPa b regarding the gas distribution SN EN 1775 1999 Gas supply Pipelines in buildings Maximum service overpressure less than 5 bar SN 38 6413 1990 Gas conduits and connections with low and medium...

Страница 16: ...h and oak wood hobrex boards plywood werzalit umakart sirkolit C2 medium combustible Pinewood larch whitewood chipboard and cork boards rubber flooring C3 easily combustible Asphalt board fibreboards...

Страница 17: ...elements Setting of temperature stage I reduced output to 50 90 C range optionally 50 115 C Setting of temperature stage II nominal output to 50 90 C range optionally 50 115 C in low temperature regi...

Страница 18: ...e and filling with new water increases the danger of corrosion and scale development In case we have to refill the heating system with water we only refill a cold boiler in order to prevent the boiler...

Страница 19: ...ose all small covers closing plate burner plate with burner mount the holder with explosive flap and check them for tightness 9 Instructions for product disposal after its service life Because the pro...

Страница 20: ...by an authorized organization contractual service accredited by DB a s Bohum n Z vod topen sk techniky VIADRUS and the manufacturer of the burner being operated To document all records about carried o...

Страница 21: ...19...

Страница 22: ...11...

Страница 23: ...ts of shell 26 exhaust neck 27 manostat valve 28 reservoirs 29 electric panel cover 30 upper rear part of sh 31 insulation of upper part of shell 32 frontal upper part of shell 33 upper part insulatio...

Отзывы: