e ) regarding the chimney 

Č

SN 06 1610 : 1985  

Elements of household appliances smoke flues. 

Č

SN 73 4201 : 2002  

Chimneys and smoke flues  design. 

The connection must be approved by a chimneyers ´ firm  and must meet all  provisions of these standards. 
The chimney must resist the flue gases condensate, otherwise in can be seriously damaged.   

 

f ) regarding the fire regulations  

Č

SN 06 1008 : 1997  

Thermal equipments fire safety. 

Č

SN 73 0823 : 1984  

Materials fire-technical properties  Building materials flammability degrees  

 

 

On view of safety

 

 when installing the  boilers it is necessary to keep a safe  200 mm distance from combustible 

materials.  For easily flammable materials which burn quickly and by themselves also after the ignition source 
removal ( like paper, millboard, stiff paper, asphalt and tar boards, wood and fibreboards, plastics, flooring 
materials) the safe distance is doubled. The safe distance is to be doubled also in case that the combustibility 
degree of a building material wasn’t proved. 

 

 
 
 

Tab.no.4  Combustibility degrees of building materials and products

 

 

Combustibility degrees of 

building materials and 

products 

Building materials and products ranked in  

combustibility degrees 

i                       

(extract from  

Č

SN 73 0823 : 1984) 

 

 

A – incombustible 

Granite, sandstone, concretes, bricks, ceramic tiles, mortars fireproof plasters,… …... 

B – hardly combustible  

acumin, izumin, heraklit, lignos, boards and basalt felt , fibreglass boards ,….. 

C

1

 – combustible with 

difficulties 

Beech and oak wood,  hobrex boards, plywood, werzalit, umakart,  sirkolit,…. 

C

2

 – medium combustible   Pinewood, larch, whitewood, chipboard and cork boards, rubber flooring  …... 

C

3

 – easily combustible  

Asphalt board, fibreboards, cellulose materials,  polyurethane, polystyrene, polyethylene, PVC, 
…. 

 

 

In case that it  has occurred the danger of combustible vapours or gases development and their penetration into 
the boiler room or at works with temporarily developed fire or explosion danger (flooring gluing works, painting 
works using the flammable paints, etc.), boiler must be shut down long enough before the works start by pulling 
the supply cord out of the socket or switching off the main switch of the burner.   

  
Warning: 
Don’t put any objects made of flammable materials on boiler and  within a distance smaller than the safe 
distance  from the boiler. 

 
 

 

5. Assembly procedure  

 

The assembly procedure is described in  „ VIADRUS G 700 boiler assembly manual “. 

 
 
 

6.Commisioning  

 

 The boiler commissioning, heat output setting and any interference with boiler electric part or 
connection of additional control elements can only be done by a contractual service  organization 
authorized to do the service works and a firm authorized to service the burner being operated. 

 

1.

 

Installation and assembly of the burner, its adjustment and boiler putting into operation together with burner 
must be done by  burner supplier ´s the service firm. This service firm will give a training to the user 
regarding the operation, provide him with burner operation manual and will ensure the  guarantee and after-
guarantee repairs.  

2.

 

Make a registration in Revision book before the boiler commissioning. 

 

 

 

Содержание G 700

Страница 1: ...1 MANUAL for boiler operation and installation VIADRUS G 700...

Страница 2: ...k in low pressure boiler rooms Thereby a long time and trouble free boiler operation will be guaranteed to both your and our satisfaction VIADRUS G 700 boiler was approved to be operated in the Czech...

Страница 3: ...ts setting 15 7 2 Electric panel 15 8 Maintenance 17 9 Instructions for product disposal after its service life 17 10 Guarantee and liability for defects 18 Purchase order Purchase order specification...

Страница 4: ...ure at maximum 4 bar operating overpressure The boiler drum is tested by 8 bar testing overpressure Boiler advantages are as follows 1 Longstanding service life of cast iron boiler drum 2 Highly econo...

Страница 5: ...bar 0 9 1 4 2 2 3 2 5 6 2 Recommended chimney draught mbar min 0 2 Boiler water volume l 252 277 302 327 352 377 Pressure loss on water side dt 20 K mbar 0 9 1 35 1 9 2 6 3 34 4 2 dt 10 K mbar 3 4 3 9...

Страница 6: ...in combustion chamber The opening 126 mm in the upper part of the frontal section is closed by a flange with boring 3 x G 1 2 for the reservoir of thermostat safety thermostat and thermometer and the...

Страница 7: ...7 Fig no 1 Boiler assembly...

Страница 8: ...8...

Страница 9: ...onsole of shell 23 connecting console 24 side part of shell frontal left 25 side part of shell frontal right 26 side part of shell 27 side part of shell rear 28 frontal part of shell segment 2 right 2...

Страница 10: ...10 4 2 Electric wiring diagrams Fig no 2 Electric panel wiring diagram...

Страница 11: ...nalling MPH1 burner stage 1 service hours meter MPH2 burner stage 2 service hours meter BT3 burner stage 2 thermostat X20 burner connector NOTE Water pressure manostat PS1 only in design for MORA firm...

Страница 12: ...12...

Страница 13: ...13 Fig no 3 Electric panel wiring diagram...

Страница 14: ...ust be left a free handling space minimum up to the boiler depth 500 mm from one side 600 mm access to the back rear access 800mm and 500 mm between two boilers When installing the boiler we must cons...

Страница 15: ...8 MPa b regarding the gas distribution SN EN 1775 1999 Gas supply Pipelines in buildings Maximum service overpressure less than 5 bar SN 38 6413 1990 Gas conduits and connections with low and medium...

Страница 16: ...h and oak wood hobrex boards plywood werzalit umakart sirkolit C2 medium combustible Pinewood larch whitewood chipboard and cork boards rubber flooring C3 easily combustible Asphalt board fibreboards...

Страница 17: ...elements Setting of temperature stage I reduced output to 50 90 C range optionally 50 115 C Setting of temperature stage II nominal output to 50 90 C range optionally 50 115 C in low temperature regi...

Страница 18: ...e and filling with new water increases the danger of corrosion and scale development In case we have to refill the heating system with water we only refill a cold boiler in order to prevent the boiler...

Страница 19: ...ose all small covers closing plate burner plate with burner mount the holder with explosive flap and check them for tightness 9 Instructions for product disposal after its service life Because the pro...

Страница 20: ...by an authorized organization contractual service accredited by DB a s Bohum n Z vod topen sk techniky VIADRUS and the manufacturer of the burner being operated To document all records about carried o...

Страница 21: ...19...

Страница 22: ...11...

Страница 23: ...ts of shell 26 exhaust neck 27 manostat valve 28 reservoirs 29 electric panel cover 30 upper rear part of sh 31 insulation of upper part of shell 32 frontal upper part of shell 33 upper part insulatio...

Отзывы: