background image

13 

the pump damage. Water for boiler and heating system filling must be clear and colourless  , with no suspended 
materials, oil and aggressive chemicals. Parameters of circulating and refilling water must correspond with 
standard as follows :   

 

 

Tab. 

č

. 3 The maximum  permissible values of heating water according to e 

Č

SN 07 7401:1992 

hardness (mmol/l) 

Ca2+ (mmol/l) 

0,3 

total Fe + Mn concentration 

(mg/l) 

3* 

*recommended value 

 

In case that the water hardness doesn’t  comply with standard it must be treated. Even heating the water with 

a higher hardness several times does not prevent the soils from getting precipitated on the boiler drum walls. 
Precipitation of 1 mm calcite reduces at a given point the heat transfer from the metal to water by 10%. 
During the heating season the heating water volume in heating system must be kept constant and it has to be 
prevented from air intake. Water from  boiler and heating system must never be discharged or taken for usage 
except for  the emergency cases like repairs etc. Water discharge and filling with new water increases the danger 
of corrosion and scale development.   

In case we have to refill  the heating system with water we only refill a  cold boiler 

in order to prevent the 

boiler sections from disruption.   

 

4.2. Regulations and guidelines  

The boiler can only be  installed and maintained  by special contractual service firm holding a valid IPB 
and ITI authorization to do the installations that is regularly retrained by the manufacturer.  A project 
according to the valid regulations must be prepared for installation.

 

a ) regarding the heating system  

Č

SN  06 0310 : 1983  

Central heating , design and assembly  

Č

SN  06 0830 : 1996  

Safety devices for central heating and TUV( hot service water) heating 

Č

SN  07 7401 : 1992  

Water and steam for thermal energy equipments with steam service pressure up to  8 MPa 

 

 

b ) 

regarding the gas distribution

 

Č

SN EN 1775 : 1999 – Gas supply–Pipelines in buildings–Maximum service overpressure less than  5 bar. 

Č

SN 38 6413 : 1990 – Gas conduits and connections with low and medium pressure  

Č

SN 07 0703 : 1986 – Gas boiler rooms. 

Č

SN 38 6405 : 1988 – Gas equipments . Operation principles . 

Č

SN 38 6420 : 1983 – Industrial gas conduits. 

Act no. . 222/94 Coll. on business conditions and state administration in energy branches and on state 

energetic inspection  . 

Regulation  91/93 Coll. issued by Czech Labour  safety Office on work safety provision in  low-pressure 

boiler rooms.  

 

c ) regarding liquid fuel distribution  

Č

SN 65 0201:1992 – Flammable liquids . Facilities and storerooms.  

Reg. MV 

Č

č

. 35/77  on fire safety at  heating oil storage and use  

PO 1410/65 z 1. 3. 1966 – interim instruction for heating with heating oil and furnace oil in view of fire 

protection  

d) regarding the electricity network  

Č

SN  33 2180 : 1980 

Connection of  electricity devices and appliances. 

Č

SN 33 2000-3 : 1995 

Electrical regulations. El. equipment. Part 3 : Basic  characteristics definition. 

Č

SN 33 2000-7-701:1997 

Electrical  regulations.  El.  equipment.  Part 7 : Single-purpose equipments and in special 
buildings. 

Č

SN  33 2130 : 1985  

Electrical regulations. Internal electric wiring. 

Č

SN IEC 446 : 1989  

Electrical  regulations.  Conductors  marking with colours or numerals. Implementing 
regulations. 

Č

SN 33 0165 : 1992  

Electrical regulations. Conductors marking with colours or numerals. Implementing 
regulations. 

Č

SN 33 2350 : 1983  

Regulations for electric equipment under difficult climatic conditions  . 

Č

SN 34 0350 : 1965  

Electrical regulations. Regulations for movable connections and cord conducts . 

Č

SN 33 1500 : 1991  

Electric  equipment revisions  

Č

SN EN 60 335- 1 : 1997  

Safety of el. appliances for household and similar purposes. Part 1- general requirements  

 
If the selected burner has not its main switch it is necessary according to  

Č

SN 07 5801:1990 – Gas fuels 

burners – to install the main switch within the grasp of  burner . The supply must be secured according to burner 
manufacturer ´s instructions. 

Содержание G 700

Страница 1: ...1 MANUAL for boiler operation and installation VIADRUS G 700...

Страница 2: ...k in low pressure boiler rooms Thereby a long time and trouble free boiler operation will be guaranteed to both your and our satisfaction VIADRUS G 700 boiler was approved to be operated in the Czech...

Страница 3: ...ts setting 15 7 2 Electric panel 15 8 Maintenance 17 9 Instructions for product disposal after its service life 17 10 Guarantee and liability for defects 18 Purchase order Purchase order specification...

Страница 4: ...ure at maximum 4 bar operating overpressure The boiler drum is tested by 8 bar testing overpressure Boiler advantages are as follows 1 Longstanding service life of cast iron boiler drum 2 Highly econo...

Страница 5: ...bar 0 9 1 4 2 2 3 2 5 6 2 Recommended chimney draught mbar min 0 2 Boiler water volume l 252 277 302 327 352 377 Pressure loss on water side dt 20 K mbar 0 9 1 35 1 9 2 6 3 34 4 2 dt 10 K mbar 3 4 3 9...

Страница 6: ...in combustion chamber The opening 126 mm in the upper part of the frontal section is closed by a flange with boring 3 x G 1 2 for the reservoir of thermostat safety thermostat and thermometer and the...

Страница 7: ...7 Fig no 1 Boiler assembly...

Страница 8: ...8...

Страница 9: ...onsole of shell 23 connecting console 24 side part of shell frontal left 25 side part of shell frontal right 26 side part of shell 27 side part of shell rear 28 frontal part of shell segment 2 right 2...

Страница 10: ...10 4 2 Electric wiring diagrams Fig no 2 Electric panel wiring diagram...

Страница 11: ...nalling MPH1 burner stage 1 service hours meter MPH2 burner stage 2 service hours meter BT3 burner stage 2 thermostat X20 burner connector NOTE Water pressure manostat PS1 only in design for MORA firm...

Страница 12: ...12...

Страница 13: ...13 Fig no 3 Electric panel wiring diagram...

Страница 14: ...ust be left a free handling space minimum up to the boiler depth 500 mm from one side 600 mm access to the back rear access 800mm and 500 mm between two boilers When installing the boiler we must cons...

Страница 15: ...8 MPa b regarding the gas distribution SN EN 1775 1999 Gas supply Pipelines in buildings Maximum service overpressure less than 5 bar SN 38 6413 1990 Gas conduits and connections with low and medium...

Страница 16: ...h and oak wood hobrex boards plywood werzalit umakart sirkolit C2 medium combustible Pinewood larch whitewood chipboard and cork boards rubber flooring C3 easily combustible Asphalt board fibreboards...

Страница 17: ...elements Setting of temperature stage I reduced output to 50 90 C range optionally 50 115 C Setting of temperature stage II nominal output to 50 90 C range optionally 50 115 C in low temperature regi...

Страница 18: ...e and filling with new water increases the danger of corrosion and scale development In case we have to refill the heating system with water we only refill a cold boiler in order to prevent the boiler...

Страница 19: ...ose all small covers closing plate burner plate with burner mount the holder with explosive flap and check them for tightness 9 Instructions for product disposal after its service life Because the pro...

Страница 20: ...by an authorized organization contractual service accredited by DB a s Bohum n Z vod topen sk techniky VIADRUS and the manufacturer of the burner being operated To document all records about carried o...

Страница 21: ...19...

Страница 22: ...11...

Страница 23: ...ts of shell 26 exhaust neck 27 manostat valve 28 reservoirs 29 electric panel cover 30 upper rear part of sh 31 insulation of upper part of shell 32 frontal upper part of shell 33 upper part insulatio...

Отзывы: