 11

5.2 

Positioning possibilities 

 

Boiler can be installed in basic environment AA5/AB5 according to 

Č

SN 33 2000-1 ed. 2. It must not 

be installed in zones 0,1,2 according to 

Č

SN 33 2000-7-701 ed. 2.  

The  boiler  is  equipped  with  a  movable  mains  supply  and  a  plug.  The  boiler  must  be  according  to  
EN 60 335 – 1 ed. 2 Art. 7.12.4 positioned in a way making sure that the plug is accessible. 
The installation of the boiler must comply with all requirements of 

Č

SN 06 1008. 

Boilers positioning with regard to the fire regulations: 

1.  Positioning on the floor made of incombustible material  

  Install boiler on fireproof thermally bottom exceeding the boiler platform by 20 mm on the sides and only 

up to the boiler drum depth.  

  If  the  boiler  is  positioned  in  a  cellar  we  recommend  to  install  it  on  a  retaining  wall  (bedding)  minimum  

50 mm high 

2. A safe distance from combustible materials  

  when  installing  and  operating  the  boiler  it  is  necessary  to  keep  a  safety  distance  of  200  mm  from  the 

materials of combustibility grade A1, A2, B and C (D);  

  for  easily  combustible  materials  of  combustibility  grade  E  (F),  which  quickly  burn  and  burn  themselves 

even after removal of ignition source (such as paper, cardboard, asphalt and tar paper, wood and wood-
fiber boards, plastics, floor coverings) the safe distance has to be doubled, i.e. to 400 mm;  

  safe distance should be doubled as bulb where the grade of reaction to fire has not been proved. 

 

Tab. no. 6  Grade of reaction to fire 

Grade of reaction to fire 

Examples of building materials and products included in the reaction to fire  

(Extract from EN 13 501-1 + A1) 

A1 – incombustible 

Granite, sandstone, concrete, bricks, ceramic tiles, mortars, fireproof plasters, … 

A2 – combustible with difficulty  acumin, izumin, heraklit, lignos, boards and basalt felt, fibreglass boards,... 
B – hardly combustible  

Beech and oak wood, hobrex boards, plywood, werzalit, umakart, sirkolit,... 

C (D) – medium combustible  

Pinewood, larch, whitewood, chipboard and cork boards, rubber flooring,... 

E (F) – easily combustible  

Asphaltboard, fibreboards, cellulose materials, polyurethane, polystyrene, 
polyethylene, PVC,…  

 

 

Number of sections  

TOEL – output in kW 

18-25 

25-37 

37-46 

46-60 

60-80 

Natural gas– output in kW 

14-22 

22-33 

33-46 

46-60 

60-80 

488 

638 

788 

938 

1088 

H (max.) 

260 

260 

320 

320 

320 

 

Fig. no. 8 

Positioning of G 50 boilers in boiler room  

Содержание G 50 Series

Страница 1: ......

Страница 2: ...allation 9 5 1 Rules and regulations 9 5 2 Positioning possibilities 11 6 Delivery and assembly 12 6 1 Delivery and accessories 12 6 2 Parts of boiler shell 12 6 3 Assembly procedure 13 7 Commissionin...

Страница 3: ...pter no 9 Important warnings Please follow the under mentioned information and especially the prescribed annual check ups to be carried out an authorized firm in order to guarantee a long time and tro...

Страница 4: ...mass without burner kg 165 216 270 319 367 Water space volume l 27 40 53 66 79 Diameter of smoke socket mm 130 130 150 150 150 Boiler dimensions height x width mm 785 x 600 length without burners mm...

Страница 5: ...light number of sections 2 3 4 5 6 Boiler output kW 18 25 25 37 37 46 46 60 60 80 Recommended burner Bentone B 10 Bentone B 20 4 Description 4 1 Boiler construction The main part of the cast iron boi...

Страница 6: ...fficiency are improved Tab no 5 Dislocation guide plates and turbulators Type of boiler G 50 2xxx G 50 3xxx G 50 4xxx G 50 5xxx G 50 6xxx Lower turbulator small 2 2 Lower turbulator big 2 2 4 guide pl...

Страница 7: ...ion which reduces losses related to heat transfer into environment The boiler steel shell surface is painted by using a good quality comaxite paint Fig no 5 Flue gases turbulence in boiler drum 4 2 Co...

Страница 8: ...tion pump run BT1 Safety thermostat BT2 Service thermostat BT3 Circulation pump thermostat MPH1 Service hours for 1 burner stage MPH2 Service hours for 2 burner stage KA1 Relay 2 of burner KA2 Relay o...

Страница 9: ...testing and marking EN 303 2 Heating boilers Part 2 Heating boilers with forced draught burners Special requirements for boilers with atomizing oil burners EN 676 Automatic forced draught burners for...

Страница 10: ...and solid fuel burning appliances having electrical connections EN 60445 ed 4 Basic and safety principles for man machine interface marking and identification Identification of equipment terminals con...

Страница 11: ...terials of combustibility grade E F which quickly burn and burn themselves even after removal of ignition source such as paper cardboard asphalt and tar paper wood and wood fiber boards plastics floor...

Страница 12: ...boiler drum can be handled by use of a hand pallet truck the boiler drum is put on a pallet or after the shells assembly there are installed the lifting lugs in the upper part of the boiler drum for i...

Страница 13: ...it on the screw heads located in the upper section of shell side parts of the shell and fix by sliding backwards 12 Screw the upper rear part of the shell by means of 3 tapping screws to the upper par...

Страница 14: ...burner with manual for burner operation and will ensure its guarantee and after guarantee repairs 2 Gas or furnace oil extra light TOEL connection to the burner and electric network 3 Boiler commissi...

Страница 15: ...the dustiness the boiler must be put out of operation Even the partial impurities deposits on the burner will degrade the combustion process and threaten the economic and reliable boilers operation W...

Страница 16: ...ulate the boilers thermal output 11 Instructions for product disposal after its service life VIADRUS a s is contractual partner of firm EKO KOM a s with client number F00120649 The packages comply wit...

Страница 17: ...manufacturing factory The manufacturer requires for guarantee applicability In sense of Act no 222 94 Coll On business conditions and government administration in certified branches and on State elect...

Страница 18: ...aging unit EN 13429 NO 3 1 Recovery by material recycling ensure recyclability in all terms of the standard for the functional packaging unit EN 13430 YES 3 2 Recovery in the form of energy ensure tha...

Страница 19: ...months after the date it was dispatched from the manufacturing factory For boiler drum 5 years after the date its dispatch from the manufacturing factory The adjustment according to boiler operation...

Страница 20: ...certificate for customer the user Record of accomplished guarantee and after guarantee repairs and regular product checpc Record date Carried out activity Contracting service organization stamp signa...

Страница 21: ...ximum 30 months after the date it was dispatched from the manufacturing factory For boiler drum 5 years after the date its dispatch from the manufacturing factory The adjustment according to boiler op...

Страница 22: ...22...

Страница 23: ...m 30 months after the date it was dispatched from the manufacturing factory For boiler drum 5 years after the date its dispatch from the manufacturing factory The adjustment according to boiler operat...

Страница 24: ...24 Date of revision 16 2013 model 2010 GB THERMODAL...

Отзывы: