background image

  9

 

  

 

Fig. no. 7 

Connection of burner connector – power  1° 

 

5. 

Positioning and installation 

5.1 

Rules and regulations 

 

Boiler  can  only  be  installed  by  a  firm  holding  a  valid  license  for  gas  appliances  installation  and 
maintenance. A project according to the valid regulations must be prepared for installation.  
The heating system must be filled with water, that meets the 

Č

SN 07 7401 requirements, especially its 

harness must not exceed the required parameters.  

 

Recommended values  

Hardness 

mmol/l 

Ca

2+

 

mmol/l 

0,3 

Concentration of total Fe + Mn 

mg/l 

(0,3)* 

*) recommended value 

 

WARNING!!! The use of anti-freeze mixture is not recommended by the manufacturer.  

a) to the heating system  

Č

SN 06 0310 

Heating systems in buildings – Designing and installation  

Č

SN 06 0830 

Heating systems in buildings – protecting device 

Č

SN 07 7401 

Water  and  steam  for  thermal  energy  equipments  with  working  pressure  up  to  
8 MPa 

EN 267  

Forced draught oil burners – Definitions, requirements, testing, marking 

EN 303-1  

Heating  boilers  –  Part  1:  Heating  boilers  with  forced  draught  burners  – 
Terminology, general requirements, testing and marking 

EN 303-2  

Heating  boilers  –  Part  2:  Heating  boilers  with  forced  draught  burners  –  Special 
requirements for boilers with atomizing oil burners 

EN 676  

Automatic forced draught burners for gaseous fuels 

b) to the gas distribution 

EN 1775 

Gas  supply  -  Gas  pipework  for  buildings  -  Maximum  operating  pressure  less 
than or equal to 5 bar - Functional recommendations. 

EN 12007-1  

Gas  supply  systems  –  Pipelines  for  maximum  operating  pressure  up  to  and 
including 16 bar – Part 1: General functional recommendations 

EN 12007-2  

Gas  supply  systems  –  Pipelines  for  maximum  operating  pressure  up  to  and 
including 16 bar – Part 2: Specific functional recommendations for polyethylene 
(MOP up to and including 10 bar) 

EN 12007-3  

Gas  supply  systems  –  Pipelines  for  maximum  operating  pressure  up  to  and 
including 16 bar – Part 3: Specific functional recommendations for steel 

EN 12007-4  

Gas  supply  systems  –  Pipelines  for  maximum  operating  pressure  up  to  and 
including 16 bar – Part 4: Specific functional recommendations for renovation 

Č

SN 38 6405 

Gas equipments. Operating principles 

Act  no.  222/94  Coll.  on  the  conditions  of  enterprise  and  public  service  performance  in  power  industry 

sector and on the state energy inspection  

B4 

UNCONNECTED 

S3 

RED 

T2 

BROWN 

T1 

BLACK 

 

BLUE 

 

YELLOW/GREEN 

BROWN 

Содержание G 50 Series

Страница 1: ......

Страница 2: ...allation 9 5 1 Rules and regulations 9 5 2 Positioning possibilities 11 6 Delivery and assembly 12 6 1 Delivery and accessories 12 6 2 Parts of boiler shell 12 6 3 Assembly procedure 13 7 Commissionin...

Страница 3: ...pter no 9 Important warnings Please follow the under mentioned information and especially the prescribed annual check ups to be carried out an authorized firm in order to guarantee a long time and tro...

Страница 4: ...mass without burner kg 165 216 270 319 367 Water space volume l 27 40 53 66 79 Diameter of smoke socket mm 130 130 150 150 150 Boiler dimensions height x width mm 785 x 600 length without burners mm...

Страница 5: ...light number of sections 2 3 4 5 6 Boiler output kW 18 25 25 37 37 46 46 60 60 80 Recommended burner Bentone B 10 Bentone B 20 4 Description 4 1 Boiler construction The main part of the cast iron boi...

Страница 6: ...fficiency are improved Tab no 5 Dislocation guide plates and turbulators Type of boiler G 50 2xxx G 50 3xxx G 50 4xxx G 50 5xxx G 50 6xxx Lower turbulator small 2 2 Lower turbulator big 2 2 4 guide pl...

Страница 7: ...ion which reduces losses related to heat transfer into environment The boiler steel shell surface is painted by using a good quality comaxite paint Fig no 5 Flue gases turbulence in boiler drum 4 2 Co...

Страница 8: ...tion pump run BT1 Safety thermostat BT2 Service thermostat BT3 Circulation pump thermostat MPH1 Service hours for 1 burner stage MPH2 Service hours for 2 burner stage KA1 Relay 2 of burner KA2 Relay o...

Страница 9: ...testing and marking EN 303 2 Heating boilers Part 2 Heating boilers with forced draught burners Special requirements for boilers with atomizing oil burners EN 676 Automatic forced draught burners for...

Страница 10: ...and solid fuel burning appliances having electrical connections EN 60445 ed 4 Basic and safety principles for man machine interface marking and identification Identification of equipment terminals con...

Страница 11: ...terials of combustibility grade E F which quickly burn and burn themselves even after removal of ignition source such as paper cardboard asphalt and tar paper wood and wood fiber boards plastics floor...

Страница 12: ...boiler drum can be handled by use of a hand pallet truck the boiler drum is put on a pallet or after the shells assembly there are installed the lifting lugs in the upper part of the boiler drum for i...

Страница 13: ...it on the screw heads located in the upper section of shell side parts of the shell and fix by sliding backwards 12 Screw the upper rear part of the shell by means of 3 tapping screws to the upper par...

Страница 14: ...burner with manual for burner operation and will ensure its guarantee and after guarantee repairs 2 Gas or furnace oil extra light TOEL connection to the burner and electric network 3 Boiler commissi...

Страница 15: ...the dustiness the boiler must be put out of operation Even the partial impurities deposits on the burner will degrade the combustion process and threaten the economic and reliable boilers operation W...

Страница 16: ...ulate the boilers thermal output 11 Instructions for product disposal after its service life VIADRUS a s is contractual partner of firm EKO KOM a s with client number F00120649 The packages comply wit...

Страница 17: ...manufacturing factory The manufacturer requires for guarantee applicability In sense of Act no 222 94 Coll On business conditions and government administration in certified branches and on State elect...

Страница 18: ...aging unit EN 13429 NO 3 1 Recovery by material recycling ensure recyclability in all terms of the standard for the functional packaging unit EN 13430 YES 3 2 Recovery in the form of energy ensure tha...

Страница 19: ...months after the date it was dispatched from the manufacturing factory For boiler drum 5 years after the date its dispatch from the manufacturing factory The adjustment according to boiler operation...

Страница 20: ...certificate for customer the user Record of accomplished guarantee and after guarantee repairs and regular product checpc Record date Carried out activity Contracting service organization stamp signa...

Страница 21: ...ximum 30 months after the date it was dispatched from the manufacturing factory For boiler drum 5 years after the date its dispatch from the manufacturing factory The adjustment according to boiler op...

Страница 22: ...22...

Страница 23: ...m 30 months after the date it was dispatched from the manufacturing factory For boiler drum 5 years after the date its dispatch from the manufacturing factory The adjustment according to boiler operat...

Страница 24: ...24 Date of revision 16 2013 model 2010 GB THERMODAL...

Отзывы: