background image

 10

c) to liquid fuel distribution  

Č

SN 65 0201 

Combustible liquids. Premises for production, storage and handling  

Prom. MV 

Č

č

. 35/77 on fire safety at storing and using the heating oil   

PO 1410/65 of 01. 03. 1966 temporary regulations for heating with heating oil and fuel oil  

d) to the electrical network  

Č

SN 33 0165 

Electrical  regulations.  Marking  the  conductors  with  colours  or  digits. 
Implementing regulations

.

 

Č

SN 33 1500 

Electrical regulations. Electrical equipments revision  

Č

SN 33 2000-1 ed. 2 

Low-voltage electrical installations – Part 1: Fundamental principles, assessment 
of general characteristics, definitions. 

Č

SN 33 2000-4-41 ed. 2  Low voltage electrical installations - Part 4-

 

41: Protection for safety - Protection 

against electric shock 

Č

SN 33 2000-5-51 ed. 3  Electrical  installations  of  buildings –  Part  5-51:  Selection  and  erection  of 

electrical equipment – Common rules 

Č

SN 33 2130 ed. 2  

Low-voltage electrical installations – Internal electric distribution lines 

Č

SN 33 2180 

Electrical regulations. Connection of electrical devices and appliances. 

Č

SN 34 0350 ed. 2  

Safety requirements for flexibile cords and cables 

EN 60079-10  

Electrical  apparatus  for  explosive  gas  atmospheres  –  Part  10:  Classification  of 
hazardous areas. 

EN 60079-14 ed.2 

Electrical  apparatus  for  explosive  gas  atmospheres  –  Part  14:  Electrical 
installations in hazardous areas (other than mines) 

EN 60 335-1 ed.2 

Household  and  similar  electrical  appliances  –  Safety  –  Part  1:  General 
requirements. 

EN 60 335-2-102 

Household  and  similar  electrical  appliances  –  Safety  –  Part  2-102:  Particular 
requirements  for  gas,  oil  and  solid-fuel  burning  appliances  having  electrical 
connections. 

EN 60445 ed. 4  

Basic  and  safety  principles  for  man-machine  interface,  marking  and 
identification – Identification of equipment terminals, conductor terminations and 
conductors 

e) to the chimney 

Č

SN 73 4201 

Chimneys  and  flue  gas  ducting–  designing,  implementation  and  connection  of 
fuel consumers. 

f) regarding the fire regulations   

Č

SN 06 1008 

Fire safety of heat installations. 

EN 13501-1  

Fire  classification  of  construction  products  and  building  elements  –  Part  1: 
Classification using test data from reaction to fire tests. 

g) oil storage  

Č

SN 65 0201 

Combustible liquids. Premises for production, storage and handling 

Č

SN 65 7991 

Oil industry products.  Fuel oils.  Technical requirements. 

Č

SN 73 0081 

Corrosion protection in building industry. 

Č

SN 75 3415 

Water protection against oil products. Facilities for handling the oil products and 
their storage.   

Promulgation MLVH no. 6/1977 Coll. on protection of quality of surface and underground waters.  

h) to the system of HWS heating  

Č

SN 06 0320 

Heating systems in buildings – Hot water preparation – Designing and planning 

Č

SN 06 0830 

Heating systems in buildings – Safety devices. 

Č

SN 75 5409  

Water installations inside buildings 

 

Regulation issued by MLVH no. 6/1977 Coll. on surface and underground waters protection. 

 

Based  on  the  regulation  issued  by  Czech  Office  for  Labour  Protection–  Code  no.  91/1993  it  is 
necessary to distinguish in design, erection, positioning and operation of low-pressure steam-boiler 
rooms: 

boilers with rated heat output up to do 50 kW  

boilers  with  rated  heat  output  up  50  kW  and  above  –  boiler  room  category  III  –  it  regards  boiler 
VIADRUS G 50 in 5 and 6 Art.  

 

Č

SN 07 0703 

Boiler room with gas fuel –operated equipments 

Č

SN 38 6420 

Industrial gas pipelines  

Содержание G 50 Series

Страница 1: ......

Страница 2: ...allation 9 5 1 Rules and regulations 9 5 2 Positioning possibilities 11 6 Delivery and assembly 12 6 1 Delivery and accessories 12 6 2 Parts of boiler shell 12 6 3 Assembly procedure 13 7 Commissionin...

Страница 3: ...pter no 9 Important warnings Please follow the under mentioned information and especially the prescribed annual check ups to be carried out an authorized firm in order to guarantee a long time and tro...

Страница 4: ...mass without burner kg 165 216 270 319 367 Water space volume l 27 40 53 66 79 Diameter of smoke socket mm 130 130 150 150 150 Boiler dimensions height x width mm 785 x 600 length without burners mm...

Страница 5: ...light number of sections 2 3 4 5 6 Boiler output kW 18 25 25 37 37 46 46 60 60 80 Recommended burner Bentone B 10 Bentone B 20 4 Description 4 1 Boiler construction The main part of the cast iron boi...

Страница 6: ...fficiency are improved Tab no 5 Dislocation guide plates and turbulators Type of boiler G 50 2xxx G 50 3xxx G 50 4xxx G 50 5xxx G 50 6xxx Lower turbulator small 2 2 Lower turbulator big 2 2 4 guide pl...

Страница 7: ...ion which reduces losses related to heat transfer into environment The boiler steel shell surface is painted by using a good quality comaxite paint Fig no 5 Flue gases turbulence in boiler drum 4 2 Co...

Страница 8: ...tion pump run BT1 Safety thermostat BT2 Service thermostat BT3 Circulation pump thermostat MPH1 Service hours for 1 burner stage MPH2 Service hours for 2 burner stage KA1 Relay 2 of burner KA2 Relay o...

Страница 9: ...testing and marking EN 303 2 Heating boilers Part 2 Heating boilers with forced draught burners Special requirements for boilers with atomizing oil burners EN 676 Automatic forced draught burners for...

Страница 10: ...and solid fuel burning appliances having electrical connections EN 60445 ed 4 Basic and safety principles for man machine interface marking and identification Identification of equipment terminals con...

Страница 11: ...terials of combustibility grade E F which quickly burn and burn themselves even after removal of ignition source such as paper cardboard asphalt and tar paper wood and wood fiber boards plastics floor...

Страница 12: ...boiler drum can be handled by use of a hand pallet truck the boiler drum is put on a pallet or after the shells assembly there are installed the lifting lugs in the upper part of the boiler drum for i...

Страница 13: ...it on the screw heads located in the upper section of shell side parts of the shell and fix by sliding backwards 12 Screw the upper rear part of the shell by means of 3 tapping screws to the upper par...

Страница 14: ...burner with manual for burner operation and will ensure its guarantee and after guarantee repairs 2 Gas or furnace oil extra light TOEL connection to the burner and electric network 3 Boiler commissi...

Страница 15: ...the dustiness the boiler must be put out of operation Even the partial impurities deposits on the burner will degrade the combustion process and threaten the economic and reliable boilers operation W...

Страница 16: ...ulate the boilers thermal output 11 Instructions for product disposal after its service life VIADRUS a s is contractual partner of firm EKO KOM a s with client number F00120649 The packages comply wit...

Страница 17: ...manufacturing factory The manufacturer requires for guarantee applicability In sense of Act no 222 94 Coll On business conditions and government administration in certified branches and on State elect...

Страница 18: ...aging unit EN 13429 NO 3 1 Recovery by material recycling ensure recyclability in all terms of the standard for the functional packaging unit EN 13430 YES 3 2 Recovery in the form of energy ensure tha...

Страница 19: ...months after the date it was dispatched from the manufacturing factory For boiler drum 5 years after the date its dispatch from the manufacturing factory The adjustment according to boiler operation...

Страница 20: ...certificate for customer the user Record of accomplished guarantee and after guarantee repairs and regular product checpc Record date Carried out activity Contracting service organization stamp signa...

Страница 21: ...ximum 30 months after the date it was dispatched from the manufacturing factory For boiler drum 5 years after the date its dispatch from the manufacturing factory The adjustment according to boiler op...

Страница 22: ...22...

Страница 23: ...m 30 months after the date it was dispatched from the manufacturing factory For boiler drum 5 years after the date its dispatch from the manufacturing factory The adjustment according to boiler operat...

Страница 24: ...24 Date of revision 16 2013 model 2010 GB THERMODAL...

Отзывы: