15
1.
Plate of the electric panel
2.
Main switch
3.
Exceeded temperature signalling and burner defect
signalling
4.
Pump’s signalling
5.
Pump’s thermostat
6.
Safety thermostat
7.
Boiler thermostat
8.
Fuse 2,5 A
9.
Running hours counter
10. Thermomanometr
11. Blind flange
12. Bushing ICOTEK
Fig. no. 11
VIADRUS G 50 control panel
9.
IMPORTANT WARNINGS
1)
The boiler only can be used for the purpose that it is destined for.
2)
The boiler can only be operated by adult persons and is forbidden to leave children without
being attended by adults.
3)
The boiler is not destined for the use by persons (incl. children) whose physical, sensual or
mental disability or lack of experience and knowledge prevent them from a safe use of the
appliance unless they are supervised or if they were not instructed on the use of appliance by a
person responsible for their safety.
4)
Children should be supervised in order to ensure that they do not play with the appliance.
5)
In case of a long-term still-stand of boilers they must be disconnected from electricity- from the
socket.
6)
Boiler rooms must be kept clean and dustless. From the boiler room area there must be removed
all sources of pollution and during the works (insulating works, boiler room cleaning) which
cause the dustiness the boiler must be put out of operation. Even the partial impurities deposits
on the burner will degrade the combustion process and threaten the economic and reliable
boilers operation. We don’t recommend to keep domestic animals (dogs, cats etc.)in boiler
rooms
7)
In case that there appears the danger of flammable vapours or gases penetration into the boiler
room or during the works at which there is a temporary fire or explosion danger (gluing the
flooring, paints using the flammable materials) the boiler must be long enough before the works
put out of operation.
8)
Don’t put ay objects made of flammable material on boiler and within a distance smaller than the
safe distance from it.
9)
The user is obliged to charge with boiler commissioning, its regular maintenance and defect
elimination only a professional contractual service accredited by VIADRUS a.s., the boilers
manufacturer, otherwise there does not apply the guarantee for boilers proper function.
“VIADRUS G 50 quality and completeness certificate“ filled in by the service contractual
organization serves as the “Guarantee certificate“.
10) Once a year it is necessary to do a regular boiler maintenance according to following table.
11) During assembly, installation and operation of the appliance it is necessary to comply with
standards that apply in the relevant country of destination.
If these conditions are not observed the guarantee repairs cannot be required.
Содержание G 50 Series
Страница 1: ......
Страница 22: ...22...
Страница 24: ...24 Date of revision 16 2013 model 2010 GB THERMODAL...