background image

 15

 

1. 

Plate of the electric panel 

2. 

Main switch 

3. 

Exceeded  temperature  signalling  and  burner  defect 
signalling 

4. 

Pump’s signalling  

5. 

Pump’s thermostat 

6. 

Safety thermostat 

7. 

Boiler thermostat 

8. 

Fuse 2,5 A 

9. 

Running hours counter 

10.  Thermomanometr 
11.  Blind flange 
12.  Bushing ICOTEK 

 

Fig. no. 11 

VIADRUS G 50 control panel 

 

9. 

IMPORTANT WARNINGS 

 

1) 

The boiler only can be used for the purpose that it is destined for.  

2) 

The  boiler  can  only  be  operated  by  adult  persons  and  is  forbidden  to  leave  children  without 
being attended by adults. 

3) 

The  boiler  is  not  destined  for  the  use  by  persons  (incl.  children)  whose  physical,  sensual  or 
mental  disability  or  lack  of  experience  and  knowledge  prevent  them  from  a  safe  use  of  the 
appliance unless they are supervised or if they were not instructed on the use of appliance by a 
person responsible for their safety.  

4) 

Children should be supervised in order to ensure that they do not play with the appliance. 

5) 

In case of a long-term still-stand of boilers they must be disconnected from electricity- from the 
socket. 

6) 

Boiler rooms must be kept clean and dustless. From the boiler room area there must be removed 
all  sources  of  pollution  and  during  the  works  (insulating  works,  boiler  room  cleaning)  which 
cause the dustiness the boiler must be put out of operation. Even the partial impurities deposits 
on  the  burner  will  degrade  the  combustion  process  and  threaten  the  economic  and  reliable 
boilers  operation.  We  don’t  recommend  to  keep  domestic  animals  (dogs,  cats  etc.)in  boiler 
rooms  

7) 

In case that there appears the danger of flammable vapours or gases penetration into the boiler 
room  or  during  the  works  at  which  there  is  a  temporary  fire  or  explosion  danger  (gluing  the 
flooring, paints using the flammable materials) the boiler must be long enough before the works 
put out of operation. 

8) 

Don’t put ay objects made of flammable material on boiler and within a distance smaller than the 
safe distance from it. 

9) 

The  user  is  obliged  to  charge  with  boiler  commissioning,  its  regular  maintenance  and  defect 
elimination  only  a  professional  contractual  service  accredited  by  VIADRUS  a.s.,  the  boilers 
manufacturer,  otherwise  there  does  not  apply  the  guarantee  for  boilers  proper  function. 
“VIADRUS  G  50  quality  and  completeness  certificate“  filled  in  by  the  service  contractual 
organization serves as the “Guarantee certificate“. 

10)  Once a year it is necessary to do a regular boiler maintenance according to following table. 
11)  During  assembly,  installation  and  operation  of  the  appliance  it  is  necessary  to  comply  with 

standards that apply in the relevant country of destination. 

If these conditions are not observed the guarantee repairs cannot be required.  

Содержание G 50 Series

Страница 1: ......

Страница 2: ...allation 9 5 1 Rules and regulations 9 5 2 Positioning possibilities 11 6 Delivery and assembly 12 6 1 Delivery and accessories 12 6 2 Parts of boiler shell 12 6 3 Assembly procedure 13 7 Commissionin...

Страница 3: ...pter no 9 Important warnings Please follow the under mentioned information and especially the prescribed annual check ups to be carried out an authorized firm in order to guarantee a long time and tro...

Страница 4: ...mass without burner kg 165 216 270 319 367 Water space volume l 27 40 53 66 79 Diameter of smoke socket mm 130 130 150 150 150 Boiler dimensions height x width mm 785 x 600 length without burners mm...

Страница 5: ...light number of sections 2 3 4 5 6 Boiler output kW 18 25 25 37 37 46 46 60 60 80 Recommended burner Bentone B 10 Bentone B 20 4 Description 4 1 Boiler construction The main part of the cast iron boi...

Страница 6: ...fficiency are improved Tab no 5 Dislocation guide plates and turbulators Type of boiler G 50 2xxx G 50 3xxx G 50 4xxx G 50 5xxx G 50 6xxx Lower turbulator small 2 2 Lower turbulator big 2 2 4 guide pl...

Страница 7: ...ion which reduces losses related to heat transfer into environment The boiler steel shell surface is painted by using a good quality comaxite paint Fig no 5 Flue gases turbulence in boiler drum 4 2 Co...

Страница 8: ...tion pump run BT1 Safety thermostat BT2 Service thermostat BT3 Circulation pump thermostat MPH1 Service hours for 1 burner stage MPH2 Service hours for 2 burner stage KA1 Relay 2 of burner KA2 Relay o...

Страница 9: ...testing and marking EN 303 2 Heating boilers Part 2 Heating boilers with forced draught burners Special requirements for boilers with atomizing oil burners EN 676 Automatic forced draught burners for...

Страница 10: ...and solid fuel burning appliances having electrical connections EN 60445 ed 4 Basic and safety principles for man machine interface marking and identification Identification of equipment terminals con...

Страница 11: ...terials of combustibility grade E F which quickly burn and burn themselves even after removal of ignition source such as paper cardboard asphalt and tar paper wood and wood fiber boards plastics floor...

Страница 12: ...boiler drum can be handled by use of a hand pallet truck the boiler drum is put on a pallet or after the shells assembly there are installed the lifting lugs in the upper part of the boiler drum for i...

Страница 13: ...it on the screw heads located in the upper section of shell side parts of the shell and fix by sliding backwards 12 Screw the upper rear part of the shell by means of 3 tapping screws to the upper par...

Страница 14: ...burner with manual for burner operation and will ensure its guarantee and after guarantee repairs 2 Gas or furnace oil extra light TOEL connection to the burner and electric network 3 Boiler commissi...

Страница 15: ...the dustiness the boiler must be put out of operation Even the partial impurities deposits on the burner will degrade the combustion process and threaten the economic and reliable boilers operation W...

Страница 16: ...ulate the boilers thermal output 11 Instructions for product disposal after its service life VIADRUS a s is contractual partner of firm EKO KOM a s with client number F00120649 The packages comply wit...

Страница 17: ...manufacturing factory The manufacturer requires for guarantee applicability In sense of Act no 222 94 Coll On business conditions and government administration in certified branches and on State elect...

Страница 18: ...aging unit EN 13429 NO 3 1 Recovery by material recycling ensure recyclability in all terms of the standard for the functional packaging unit EN 13430 YES 3 2 Recovery in the form of energy ensure tha...

Страница 19: ...months after the date it was dispatched from the manufacturing factory For boiler drum 5 years after the date its dispatch from the manufacturing factory The adjustment according to boiler operation...

Страница 20: ...certificate for customer the user Record of accomplished guarantee and after guarantee repairs and regular product checpc Record date Carried out activity Contracting service organization stamp signa...

Страница 21: ...ximum 30 months after the date it was dispatched from the manufacturing factory For boiler drum 5 years after the date its dispatch from the manufacturing factory The adjustment according to boiler op...

Страница 22: ...22...

Страница 23: ...m 30 months after the date it was dispatched from the manufacturing factory For boiler drum 5 years after the date its dispatch from the manufacturing factory The adjustment according to boiler operat...

Страница 24: ...24 Date of revision 16 2013 model 2010 GB THERMODAL...

Отзывы: