19
Intended for user VIADRUS a.s.
Bezru
č
ova 300
735 81 Bohumín
Guarantee certificate and Quality and completeness certificate
for VIADRUS G 50 … boiler
Boiler serial number
..............................……
Boiler output
......................................
User (surname, name)
………………………………………………………………………………
Address (street, town, postcode)
………………………………………………………………………………
Telephone/Fax
………………………………………………………………………………
Service gas overpressure:
18 – 23 mbar natural gas
furnace oil extra light
according to burner documentation
Boiler complies with requirements:
EN 267
Forced draught oil burners – Definitions, requirements, testing, marking
EN 297
Gas – fired central heating boilers – Type B
11
and B
11BS
fitted with atmospheric burners of nominal heat
input not exceeding 70 kW
EN 303-1
Heating boilers – Part 1: Heating boilers with forced draught burners – Terminology, general
requirements, testing and marking
EN 303-2
Heating boilers – Part 2: Heating boilers with forced draught burners – Special requirements for boilers
with atomizing oil burners
EN 676
Automatic forced draught burners for gaseous fuels
VIADRUS a.s. provides the guarantee:
–
For boilers 24 months after the boiler putting into operation, but maximum 30 months after the date it was
dispatched from the manufacturing factory.
–
For boiler drum 5 years after the date its dispatch from the manufacturing factory.
The adjustment according to boiler operation manual operation and installation will be done by contractual
service organization.
The completeness including the standard accessories and the output setting according to „Operation and
installation manual“ is guaranteed by manufacturer through its contracting service organization.
The guarantee certificate isn’t valid without having been filled in.
Stoking test results:
Measured values
Numeric value
Gas input pressure
(mbar)
pressure at the nozzle
(mbar)
Hourly consumption
(m3. h
-1
, kg.h
-1
)
The user confirms that:
•
the boiler adjusted by the contracting service organization didn’t show any defect during the stoking test
•
he received the „Operation and installation manual“ with properly filled-in guarantee certificate and Quality
certificate
•
he was made acquainted with boiler operation and maintenance
………………………………………………
………………………………………………
………………………………………………
Manufacture date
Manufacturer’s stamp
Controlled by (signature)
………………………………………………
………………………………………………
………………………………………………
Date of installation
Installation company
(stamp, signature)
User’s signature
………………………………………………
………………………………………………
………………………………………………
Date of putting into operation
Contractual service organization
(stamp, signature)
User’s signature
Содержание G 50 Series
Страница 1: ......
Страница 22: ...22...
Страница 24: ...24 Date of revision 16 2013 model 2010 GB THERMODAL...