Assembly procedure 

 

1. 

Put the consoles (pos. 7) between the anchor bolts nuts with washers and risers at the top of the front 
and rear boiler section. 

2. 

Chamfered side of the console is directed to the boiler section. 

3. 

Put the boiler body insulation on the boiler body (pos. 10). 

4. 

Put the side parts of the shell on the consoles (pos. 3) – with the narrower cutout in the front part of the 
boiler. 

5. 

In the rear part of the boiler screw the rear upper part of the shell with insulation (pos.11) and rear lower 
part of the shell with insulation (pos.12) to the side parts of the shell by means of tapping screws. 

6. 

To  2  pc  M5  threaded  rods  welded  in  the  upper  part  of  the  shell  (pos.  4)  put  the  strip  KZL  (pos.16) 
according to the selected wiring outlet direction and secure with 2 pc M5 nuts. 

7. 

To the top section of the side parts fit 2 M5 screws in the front part and 2 M5 screws in the rear part it 
means 4 pc M5 screws altogether so as to retain the gap of the sheet thickness between the shell and 
the screw head  

8. 

Before mounting the control box put out the perforated section in the upper part of the shell. 

9. 

Pull the conductors, capillaries of thermostats and thermomanometer through the opening. 

10.  Put the capillaries of thermostats and thermometer sensor into the basin installed in the top hub of the 

front  boiler  section  and  secure  with  the  spring  of  capillaries.  Screw  the  check  valve  of  the  manometer 
into the bottom hub of the front section. 

11.  Screw the control box by means of 2 pc screws M6 with washers and nuts to the upper part of the shell 

and then put it on the screw heads located in the upper section of shell side parts of the shell and fix by 
sliding backwards. 

12.  Screw the upper rear part of the shell by means of 3 tapping screws to the upper part of the shell. 
13.  After  the  burner  installation  is  complete  put  the  front  part  of  the  shell  with  the  label  VIADRUS  on  the 

screw  heads  located  in  the  front  part  of  the  shell  side  parts  (pos.  3).  Before  mounting  click  into  2  pc 
handles (pos. 13). 

14.  Cover  the  lower  section  of  the  front  part  of  the  shell  with  its  bottom  part  (pos.  2)  using  2  pc  tapping 

screws. 

 

 

Number of sections 

furnace oil extra light(TOEL) – output inW 

18-25 

25-37 

37-46 

46-60 

60-80 

natural gas– output inW 

14-22 

22-33 

33-46 

46-60 

60-80 

488 

638 

788 

938 

1088 

130 

130 

150 

150 

150 

H (max.) 

260 

260 

320 

320 

320 

 

Fig. no. 10 

Dimensions boilers VIADRUS G 50 

 

15.  Filling the heating system with water.  
 

The heating system must be thoroughly flushed in order to wash out all impurities. Water for boilers and 
heating  system  filling  must  be  clear  and  colourless,  with  no  suspended  materials,  oil  and  aggressive 
chemicals. Its hardness must correspond to 

Č

SN 07 7401 and it is necessary to treat water in case its 

hardness  is  unsuitable.  The  heating  systems  with  an  open  expansion  reservoir  allow  a  direct  contact 
between  heating  water  and  atmosphere.  During  the  heating  season  the  expanding  water  in  reservoir 
absorbs  oxygen  which  increases  the  corrosive  affects  and at the same lot of water gets evaporated. It 
can  only  be  replenished  by  water  treated  according  to 

Č

SN  07  7401.  During  the  heating  season  the 

water volume in heating system must be kept constant. When refilling the heating system with water it is 
necessary to prevent it from air intake. Water from boilers and heating system must never be discharged 

Содержание G 50 Series

Страница 1: ......

Страница 2: ...allation 9 5 1 Rules and regulations 9 5 2 Positioning possibilities 11 6 Delivery and assembly 12 6 1 Delivery and accessories 12 6 2 Parts of boiler shell 12 6 3 Assembly procedure 13 7 Commissionin...

Страница 3: ...pter no 9 Important warnings Please follow the under mentioned information and especially the prescribed annual check ups to be carried out an authorized firm in order to guarantee a long time and tro...

Страница 4: ...mass without burner kg 165 216 270 319 367 Water space volume l 27 40 53 66 79 Diameter of smoke socket mm 130 130 150 150 150 Boiler dimensions height x width mm 785 x 600 length without burners mm...

Страница 5: ...light number of sections 2 3 4 5 6 Boiler output kW 18 25 25 37 37 46 46 60 60 80 Recommended burner Bentone B 10 Bentone B 20 4 Description 4 1 Boiler construction The main part of the cast iron boi...

Страница 6: ...fficiency are improved Tab no 5 Dislocation guide plates and turbulators Type of boiler G 50 2xxx G 50 3xxx G 50 4xxx G 50 5xxx G 50 6xxx Lower turbulator small 2 2 Lower turbulator big 2 2 4 guide pl...

Страница 7: ...ion which reduces losses related to heat transfer into environment The boiler steel shell surface is painted by using a good quality comaxite paint Fig no 5 Flue gases turbulence in boiler drum 4 2 Co...

Страница 8: ...tion pump run BT1 Safety thermostat BT2 Service thermostat BT3 Circulation pump thermostat MPH1 Service hours for 1 burner stage MPH2 Service hours for 2 burner stage KA1 Relay 2 of burner KA2 Relay o...

Страница 9: ...testing and marking EN 303 2 Heating boilers Part 2 Heating boilers with forced draught burners Special requirements for boilers with atomizing oil burners EN 676 Automatic forced draught burners for...

Страница 10: ...and solid fuel burning appliances having electrical connections EN 60445 ed 4 Basic and safety principles for man machine interface marking and identification Identification of equipment terminals con...

Страница 11: ...terials of combustibility grade E F which quickly burn and burn themselves even after removal of ignition source such as paper cardboard asphalt and tar paper wood and wood fiber boards plastics floor...

Страница 12: ...boiler drum can be handled by use of a hand pallet truck the boiler drum is put on a pallet or after the shells assembly there are installed the lifting lugs in the upper part of the boiler drum for i...

Страница 13: ...it on the screw heads located in the upper section of shell side parts of the shell and fix by sliding backwards 12 Screw the upper rear part of the shell by means of 3 tapping screws to the upper par...

Страница 14: ...burner with manual for burner operation and will ensure its guarantee and after guarantee repairs 2 Gas or furnace oil extra light TOEL connection to the burner and electric network 3 Boiler commissi...

Страница 15: ...the dustiness the boiler must be put out of operation Even the partial impurities deposits on the burner will degrade the combustion process and threaten the economic and reliable boilers operation W...

Страница 16: ...ulate the boilers thermal output 11 Instructions for product disposal after its service life VIADRUS a s is contractual partner of firm EKO KOM a s with client number F00120649 The packages comply wit...

Страница 17: ...manufacturing factory The manufacturer requires for guarantee applicability In sense of Act no 222 94 Coll On business conditions and government administration in certified branches and on State elect...

Страница 18: ...aging unit EN 13429 NO 3 1 Recovery by material recycling ensure recyclability in all terms of the standard for the functional packaging unit EN 13430 YES 3 2 Recovery in the form of energy ensure tha...

Страница 19: ...months after the date it was dispatched from the manufacturing factory For boiler drum 5 years after the date its dispatch from the manufacturing factory The adjustment according to boiler operation...

Страница 20: ...certificate for customer the user Record of accomplished guarantee and after guarantee repairs and regular product checpc Record date Carried out activity Contracting service organization stamp signa...

Страница 21: ...ximum 30 months after the date it was dispatched from the manufacturing factory For boiler drum 5 years after the date its dispatch from the manufacturing factory The adjustment according to boiler op...

Страница 22: ...22...

Страница 23: ...m 30 months after the date it was dispatched from the manufacturing factory For boiler drum 5 years after the date its dispatch from the manufacturing factory The adjustment according to boiler operat...

Страница 24: ...24 Date of revision 16 2013 model 2010 GB THERMODAL...

Отзывы: