background image

Table of Contents

  

12/2/20 

FM MANUAL.DOCX 

Table of Contents

  

Copyright 2020, Vestil Manufacturing Corp. 

Page 6 of 20 

RECOMMENDED DOCK EDGE FOR NEW CONSTRUCTION. The recommended dock edge for new 

construction is a well-anchored 6-inch channel with a minimum thickness of ¼ inch (C6x8.2). Anchors must be 
made from 1 ½” lengths of 6-inch channel, welded inside the channel  at a 12-inch pitch.  

The CE curb edge option is available through your Vestil distributor. 

 

 

TOOLS AND SUPPLIES NEEDED. The following tools and supplies will be needed for the installation. These 
are not supplied with the product. 

  Tape measure 

  Forklift with a lift boom 

  Air or electric grinder 

  Arc welder 

  1-1/2” open-end wrench or pipe wrench 

  ¾” open-end wrench, box wrench, or socket wrench (19 mm will also work) 

  Rotary hammer drill * 

  3/4” × 5” concrete anchors (up to 14 needed, depending on dock construction) * 

  Approach ramp (for docks under 50” tall) * 

  Approach plate (for docks not having a steel edge) * 

 
* item depends on condition of dock edge

 

Содержание FM-0648

Страница 1: ...product Inspect the product to determine whether it sustained damage during transport If damage is discovered record a complete description of it on the bill of lading and file a claim with the carrie...

Страница 2: ...ct property damage such as operation that might damage the product HAZARDS Vestil Manufacturing strives to identify all foreseeable hazards associated with the use of its products However material han...

Страница 3: ...e dock leveler if objects are on top of it ALWAYS check the dock leveler for foreign objects before use Only use this item as intended DO NOT exceed the load limit for the dock leveler The load limit...

Страница 4: ...g Corp Page 4 of 20 MAJOR COMPONENTS AND ORIENTATION Refer to this drawing to identify the major components of your Edge O Dock Leveler In this manual right and left will always correspond to the righ...

Страница 5: ...4 14 33016 FLAT WASHER LOW CARBON USS ZINC PLATED 5 8 4 INSTALLATION INSTRUCTIONS Read all instructions carefully before unpacking and installing your Edge O Dock leveler Follow these instructions ca...

Страница 6: ...b edge option is available through your Vestil distributor TOOLS AND SUPPLIES NEEDED The following tools and supplies will be needed for the installation These are not supplied with the product Tape m...

Страница 7: ...78 73 1 2 58 1 2 29 537 lb 20 000 lb FM 2566 93 66 61 1 2 46 1 2 29 545 lb 25 000 lb FM 2572 99 72 67 1 2 51 1 2 29 577 lb 25 000 lb FM 3066 93 66 61 1 2 46 1 2 29 13 16 632 lb 30 000 lb FM 3072 93 6...

Страница 8: ...ck leveler not included with product Select the approach ramp that sets the dock height to 50 1 The dock leveler provides a smooth transition from the dock floor to the top of the leveler Follow the m...

Страница 9: ...p 13 STEP 8 docks with a steel edge less than 6 Measure the height of the dock from the edge of the dock to the driveway surface below the dock edge Height of dock edge is 50 1 Proceed to Step 9 Heigh...

Страница 10: ...wn both sides of the mounting plate to the bottom of the steel edge STEP 12 Install four 5 anchors into the dock through the holes in the mounting plate into the dock STEP 13 Weld the bumper boxes to...

Страница 11: ...und in the MOUNTING DIMENSIONS on page 7 STEP 17 Measure the height of the dock from the edge of the dock to the driveway surface below the dock edge Height of dock edge is 50 1 Proceed to Step 18 Hei...

Страница 12: ...to the floor with six x 5 anchor bolts Do not tighten the bolts at this time STEP 22 Tack weld the mounting plate to the approach plate at both ends The tops of the mounting plate and approach plate...

Страница 13: ...ck leveler is shipped with its kick out link disconnected from the lip plate This must be installed for the dock leveler to function properly The kick out link is on the right side with respect to the...

Страница 14: ...he spring through the tightening process Be sure to maintain a good grip on the wrench as to not lose spring tension DO NOT use an adjustable wrench for this process STEP 35 Have the second person use...

Страница 15: ...Collect all photographs and records into a file Mark the file appropriately to identify it This record documents satisfactory condition Compare the results of future inspections to this record to dete...

Страница 16: ...s the operator can lose his balance 4 Push the handle forward The lip plate will come to rest on the bed of the trailer Personnel on or around the trailer shall STAY CLEAR by at least 10 feet from the...

Страница 17: ...tion See Labeling diagram on p 19 2 Frequent inspection At the beginning of every shift a designated person shall clean dirt debris and fluids from the tread plate surfaces 3 Periodic inspection Month...

Страница 18: ...the spring winding tube The first person will then pull his wrench a quarter turn in the indicated direction to add tension Re tighten the two bolts on the flats of the interior bar NOTE For increased...

Страница 19: ...e unit when you first receive it as discussed in the Record of Satisfactory Condition portion of the Inspections and Maintenance section on p 17 Make sure that your record includes a photograph of eac...

Страница 20: ...ic pumps motor controllers and cylinders It also covers defects in original parts that wear under normal usage conditions wearing parts such as bearings hoses wheels seals brushes and batteries How lo...

Отзывы: