Table of Contents
12/2/20
FM MANUAL.DOCX
Table of Contents
Copyright 2020, Vestil Manufacturing Corp.
Page 5 of 20
Item no.
Vestil p/n
Description
Qty
1
17-513-077
17-513-007
17-513-006
17-513-079
17-513-013
07-513-012
07-513-075
07-513-074
WELDMENT, ASSEMBLY, DECK
FM-0648
FM-2066
FM-2072
FM-2078
FM-2566
FM-2572
FM-3066
FM-3072
1
2
07-525-004
ASSEMBLY, HANDLE
1
3
07-516-008
ASSEMBLY, LINK ARM
1
4
07-612-001
ASSEMBLY, PIN, SPRING RETAINER
1
5
07-518-009
ASSEMBLY, TORSION TUBE, SPRING TENSIONER
1
6
07-514-001
WELDMENT, 13” BUMPER BOX
2
7
21-112-003
PIN, 1/2” X 1-15/16” RETAINING CLEVIS PIN
4
8
07-025-005
HANDLE, BLACK RUBBER, 6”
1
9
07-040-003
LEVER, SPRING LINKAGE BAR
2
10
07-146-009
SPRING
1
11
65078
EXTENDED PRONG COTTER PIN, ZINC FINISH 1/8” X 1-1/2”
4
12
29-001-001
SPECIALTY MOLDED RUBBER BUMPER
2
13
11311
BOLT, HHCS, #5 PLAIN 5/8”-11 X 2”
4
14
33016
FLAT WASHER, LOW CARBON, USS ZINC PLATED, 5/8”
4
INSTALLATION INSTRUCTIONS
Read all instructions carefully before unpacking and installing your Edge-O-Dock leveler. Follow these
instructions carefully.
BEFORE YOU BEGIN. The procedure for installing an Edge-O-Dock dock leveler depends on the dock
height and the construction of the dock edge. This manual assumes an optimum dock height of 50”.
The preferred dock edge construction is a well-anchored six-inch steel channel, ¼” thick, embedded and
anchored in the dock edge. This feature allows the dock leveler to be welded into position. This also allows you
to install an approach ramp to increase the dock leveler’s height.
With a shorter steel dock edge, concrete anchors will be required in addition to welding.
If no steel edge is present, a steel approach plate must be anchored to the floor to provide a welding surface.
DO NOT use a dock leveler that has not been welded to the dock. FAILURE TO FOLLOW THE PROPER
INSTALLATION PROCEDURE WILL DECREASE THE CAPACITY OF DOCK LEVELER.