Connecting the Power Supply 33
WARNING
Improperly connecting the power supply can result in electrical
shock and electrocution Follow all applicable electrical codes
.
of the local authority having jurisdiction In the absence of
.
such requirements follow the latest edition of
,
the National
Electrical Code NFPA 70 in the USA or the latest edition
(
)
of CSA C22 1 Canadian Electrical Code Part 1 in Canada
.
.
Connecting the power supply should be performed only by a
licensed professional.
When connecting the power supply follow these guidelines
,
:
●
Do not connect the electric supply until all plumbing and gas
piping is complete and the boiler has been filled with water.
●
Do not connect the boiler to a 220 240V AC power supply Doing
-
.
so will damage the boiler and void the warranty.
●
All the
VC boilers come with a factory installed
VESTA
-
,
3 pronged grounded plug The boiler can be plugged into any
-
(
)
.
grounded electrical outlet nearby as it requires only 2 Amps It is
,
.
not necessary to run a dedicated electrical line to the boiler.
●
If local codes require the boiler to be wired directly remove
,
and discard the factory installed plug Install a power switch
-
.
between the breaker and the boiler to facilitate end user
-
maintenance and servicing Connect the boiler to a 110 120V AC
.
-
at 60 Hz with a maximum of 2A.
●
The boiler must be electrically grounded If using the power
.
plug ensure that the electrical outlet you connect the boiler
,
to is properly grounded If wiring the boiler directly to a power
.
supply do not attach the ground wire to either the gas or the
,
water piping as plastic pipe or dielectric unions may prevent
proper grounding.
●
We recommend using a surge protector to protect the boiler
from power surges.
●
If there is a power failure in cold weather areas the freeze
,
prevention system in the boiler will not operate and may
result in freezing of the heat exchanger In cold weather areas
.
where power failures are common you must completely drain
,
the boiler to prevent damage if the power will be off for any
extended period of time A battery back up available at most
.
-
(
computer retailers may be used to supply hot water during
)
periods of power outages Damage caused by freezing is not
.
covered under warranty.
CAUTION
Label all wires before disconnecting them when you work on
the controls Wiring errors can cause improper and dangerous
.
operation Verify proper operation after servicing
.
.
7 Connecting the Power Supply
.
Содержание VC 100 (LP) COMBI
Страница 11: ...1 5 Dimensions VC 100 COMBI About the Boiler 11 ...
Страница 12: ...VC 120 140 COMBI 12 About the Boiler ...
Страница 40: ...10 2 Component Assembly Diagrams and Parts Lists VC 100 COMBI 10 2 1 Case Assembly 40 Appendixes ...
Страница 41: ...Appendixes 41 10 2 2 Burner Assembly 204 220 221 ...
Страница 42: ...10 2 3 Waterway Assembly 303 345 306 307 308 340 342 341 343 344 345 343 341 305 42 Appendixes ...
Страница 45: ...10 3 Component Assembly Diagrams and Parts Lists VC 120 140 COMBI 10 3 1 Case Assembly Appendixes 45 ...
Страница 46: ...10 3 2 urner Assembly B 46 Appendixes ...
Страница 47: ...Appendixes 47 10 3 3 Assembly Water Line 347 348 349 353 350 351 338 319 347 348 349 353 35 35 3 3 ...