![Vesta VC 100 (LP) COMBI Скачать руководство пользователя страница 34](http://html.mh-extra.com/html/vesta/vc-100-lp-combi/vc-100-lp-combi_installation-manual_1008954034.webp)
34
Installation Check list
After installing the boiler review the following checklist You should be able to answer Yes to all of the items in the check
f not r
,
.
“
”
list. I
, eview the
appropriate sections to complete the installation To troubleshoot any operational problems refer to Troubleshooting i
s Manual
.
“
”
n the User
’
.
If you have additional questions or need assistance with installation contact Technical Support at 1 800 761 0053 or refer
,
-
-
-
to the technical support section of VESTA s website www vesta com
’
(
.
.
).
Installing the boiler
Yes
No
Have you maintained the required clearances from building openings and intake air vents?
Have you minimized the distance between the boiler and the vent termination?
Have you minimized the distance between the boiler and major fixtures?
Have you maintained the proper service and maintenance clearances?
Is the make up air supply sufficient for proper operation
-
?
Is the make up air supply free from dust dirt corrosive elements and flammable vapors
-
,
,
,
?
Is the boiler and vent piping clear of combustible materials including clothing cleaning materials and rags
,
,
,
?
Connecting the Gas Supply
Yes
No
Does the gas supply match the type specified on the boiler s rating plate
’
?
Is the gas line at least 1 2 or 3 4 in ID Inner Diameter
/
/
(
)?
Is the gas supply line sufficient in length and diameter to deliver the required BTUs?
Have you measured the pressure of the gas supply line?
Is the gas supply pressure within the recommended ranges specified in this manual?
Is the gas supply line equipped with a manual shut off valve
-
?
Have you tested the gas line pressure and all fittings for leaks?
Has the gas company inspected the installation if required
,
?
Connecting the Domestic Water Supply
Yes
No
Is the water supply pressure sufficient greater than 40 psi
(
)?
Have you installed shut off valves on the inlet and outlet to facilitate cleaning of the inlet water filter?
Have you bled the air out at each fixture?
Have you checked each fixture to ensure hot water is being supplied?
Have you cleaned the inlet water filter?
If you installed a recirculation line have you insulated the hot water pipes and the return line
,
?
8 Installation Check list
.
Содержание VC 100 (LP) COMBI
Страница 11: ...1 5 Dimensions VC 100 COMBI About the Boiler 11 ...
Страница 12: ...VC 120 140 COMBI 12 About the Boiler ...
Страница 40: ...10 2 Component Assembly Diagrams and Parts Lists VC 100 COMBI 10 2 1 Case Assembly 40 Appendixes ...
Страница 41: ...Appendixes 41 10 2 2 Burner Assembly 204 220 221 ...
Страница 42: ...10 2 3 Waterway Assembly 303 345 306 307 308 340 342 341 343 344 345 343 341 305 42 Appendixes ...
Страница 45: ...10 3 Component Assembly Diagrams and Parts Lists VC 120 140 COMBI 10 3 1 Case Assembly Appendixes 45 ...
Страница 46: ...10 3 2 urner Assembly B 46 Appendixes ...
Страница 47: ...Appendixes 47 10 3 3 Assembly Water Line 347 348 349 353 350 351 338 319 347 348 349 353 35 35 3 3 ...