28
Venting the Boiler
5 2 Selecting Vent Pipe Materials
.
Venting requirements differ in the US and Canada Consult the
.
following chart or the most recent edition of ANSI Z223 1 NFPA
. /
54 or CAN CGA B149 1 as well as all applicable local codes and
/
. ,
regulations when selecting vent pipe materials Do not use cellular
.
core based pipe materials for the exhaust vent.
Locale
Recommended Vent Materials
USA
●
PVC Schedule 40 Solid Core
(
)
●
CPVC Schedule 40 or 80 Solid Core
(
)
●
Approved Polypropylene*
Canada**
●
Type BH Special Gas Vent Class IIA PVC
(
)
●
Type BH Special Gas Vent Class IIB CPVC
(
)
●
Type BH Special Gas Vent Class IIC
(
)
Polypropylene
*
:
Approved polypropylene systems include
Durevent Polypro Single Wall 2PPS xxx 2
3PPS xxx 3
(
):
-
(
”
),
-
(
”
)
Centrotherm Innoflue SW ISxx02xx 2
ISxx03xx 3
:
(
”
),
(
”
)
Refer to manufacturer s literature for detailed information
’
.
**
,
-
For installation in Canada field supplied plastic vent piping must comply
with CAN CGA B149 1 latest edition and be certified to the Standard
/
. (
)
For Type BH Gas Venting Systems ULC S636 Components of this listed
,
-
.
system must not be interchanged with other vent systems or unlisted
pipes or fittings All plastic components and specified primers and glues
.
of the certified vent system must be from a single system manufacturer
and must not be intermixed with another system manufacturer s parts
’
.
The supplied vent connector and vent termination are certified as part
of the boiler.
CAUTION
●
This boiler has a built in control to limit the exhaust
-
temperature to 149 F 65 C As a result the boiler can be
°
( °
).
,
vented with Schedule 40 PVC.
●
In high temperature applications the exhaust temperature
,
can exceed 149 F 65 C In that case you must use Schedule
°
( ° ).
,
40 or 80 CPVC or Approved Polypropylene in the USA
or Type BH Special Gas Vent Class IIB CPVC or Class IC
(
)
(
)
-
.
Polypropylene that conforms to ULC S636 in Canada
●
Do not install the vent terminal indoors.
5 3
.
Venst Terminal Installation Precautions
Note the following vent terminal installation requirements
●
Install the vent terminal with a upward slope(2~3
˚
)
●
If multiple units are installed, terminals must be separated
by 18" or more in a plain view regardless of the vertical clearance.
18
18
●
Avoid installing the terminal where obstacles will block it.
●
Do not install the vent terminals vertically in-line. Do not cover
the vent terminal with any type of protective screen or enclosure.
In-line or blocked terminals can cause abnormal combustion
resulting inundesired performance from the appliance.
●
Avoid storing hazardous objects near the terminal.
Содержание VC 100 (LP) COMBI
Страница 11: ...1 5 Dimensions VC 100 COMBI About the Boiler 11 ...
Страница 12: ...VC 120 140 COMBI 12 About the Boiler ...
Страница 40: ...10 2 Component Assembly Diagrams and Parts Lists VC 100 COMBI 10 2 1 Case Assembly 40 Appendixes ...
Страница 41: ...Appendixes 41 10 2 2 Burner Assembly 204 220 221 ...
Страница 42: ...10 2 3 Waterway Assembly 303 345 306 307 308 340 342 341 343 344 345 343 341 305 42 Appendixes ...
Страница 45: ...10 3 Component Assembly Diagrams and Parts Lists VC 120 140 COMBI 10 3 1 Case Assembly Appendixes 45 ...
Страница 46: ...10 3 2 urner Assembly B 46 Appendixes ...
Страница 47: ...Appendixes 47 10 3 3 Assembly Water Line 347 348 349 353 350 351 338 319 347 348 349 353 35 35 3 3 ...