
Vertiv
|
NetXtend +12 VDC Bulk Output Power System Installation and User Manual (UM588706000)
|
Rev. H
40
MAINTENANCE
System Maintenance Procedures
It is recommended to perform the maintenance procedures listed in
every 6-months to ensure continual
system operation.
Table 2
:
Maintenance Procedures to be Performed at 6-Month Intervals
PROCEDURE
REFERENCED IN
Check ventilation
openings for
obstructions such as
dust, papers,
manuals, etc.
--
Inspect and tighten
all installer’s
connections
Making Electrical
Connections section
of this document.
BBU (Battery Backup Unit) Module
Refer to the BBU instructions (UM1B123000) for maintenance information.
BBU Storage Maintenance Charge
When the BBU is not plugged into a rack, there will be no external LEDs illuminated to conserve power. If BBU’s are
stored, they will periodically need a refreshing charge. Refer to the BBU Instructions (UM1B123000) for more
information.
Содержание NetSure PSS12/2000-19B
Страница 44: ...UM582127000100 11AD1209MU RH 06 17...