15
RFSDV34 Freestanding Direct Vent Gas Stove
10003550
Vertical Through-the-Roof Installation
1. Locate your stove.
. Plumb to center of the 4” (10 mm) flue collar from
ceiling above and mark position.
3. Cut opening equal to 9
³⁄₈
” x 9
³⁄₈
” (40 x 40 mm).
4. Proceed to plumb for additional openings through the
roof. In all cases, the opening must provide a minimum
of 1” (5 mm) clearance to the vent pipe, i.e., the hole
must be at least 9
³⁄₈
” x 9
³⁄₈
” (40 x 40 mm).
5. Place stove into position.
6. Place firestop(s) #7DVFS or Attic Insulation Shield
#7DVAIS into position and secure. (Fig. 4)
If there is a room above ceiling level, firestop
spacer must be installed on both the bottom
and the top side of the ceiling joists. If an
attic is above ceiling level a 7DVAIS (Attic
Insulation Shield) must be installed.
The enlarged ends of the vent section always
face downward. (Fig. 25)
TWL101a
Twist Lock Pipe
2/8/99 djt
#8 Sheet Metal Screws
(3 per joint)
Sealant
Storm Collar
TWL101a
Fig. 25
Roof flashing.
11"
11"
Attic Insulation
Shield
Joist
Ceiling In-
stallation
Joist
Upper Floor
Firestop Spacer
Nails (4)
FP1516
Fig. 24
Place firestop spacer(s) and secure.
11” x 11” (95 x 95 mm)
7. Install roof support (Fig. ) and roof flashing making
sure upper flange of flashing is below the shingles. (Fig.
5)
8. Install appropriate pipe sections until the venting is above
the flashing. (Fig. 5)
9. Install storm collar and seal around the pipe.
10. Add additional vent lengths for proper height. (Fig.
3)
11. Apply high temperature sealant to 4” and 7” collars.