background image

24

CDVZ Series Direct Vent Gas Fireplace

20014621

1

2

3

4

Example: 
 

Elbow 1  =  90°

 

Elbow 2  =  45° 

 

Elbow 3  =  45°

 

Elbow 4  =  90°

  Total angular variation  =  270°

1 + 2 + 3 + 4 = 270°

FP1239

Fig. 48

  Maximum number of elbow degrees.

STEP 2

Place fireplace into position. (Fig. 49) Measure the vertical 

height (X) required from the base of the flue collars to the 

center of the wall opening.

STEP 3

Attach appropriate venting component(s) to the fireplace 

with three (3) screws. (Fig. 50) Follow with the installation 

of the inner and outer elbow. Again secure joints with three 

(3) sheet metal screws. 

X

FP1240

Fig. 49

  Vertical height requirement.

STEP 4

Measure  the  horizontal  length  requirement  including  a 

2” (51 mm) overlap, ie from the elbow to the outside wall 

face plus 2” (51 mm) (or the distance required if installing 

a second 90° elbow). (Fig. 50)

Always  install  horizontal  venting  on  a  level 

plane.

STEP 5

Use appropriate length of pipe sections - telescopic or fixed 

- and install the horizontal vent sections. The sections which 

go through the wall are packaged with the starter kit, and 

can be cut to suit if necessary. (Fig. 48)

Sealing the gaps between the vent pipe and 

firestop  with  high  temperature  sealant  will 

restrict cold air being drawn in around fire-

place.

STEP 6

Guide  the  vent  terminations  4”  and  7”  collars  into  their 

respective vent pipes. Double check that the vent pipes 

overlap the collars by 2” (51 mm). Secure the termination 

to  the  wall  with  screws  provided  and  caulk  around  the 

wall plate to weatherproof. (Fig. 52) As an alternative to 

screwing the termination directly to the wall you may also 

use  expanding  plugs  or  an  approved  exterior  construc-

tion adhesive. You may also attach the termination with 

screws through the inner body into the 4” (102 mm) vent 

pipe however for this method you must extend the 4” (102 

mm) pipe approximately 6” (152 mm) beyond the outer 

face of the wall.
Support horizontal pipes every 3’ (914 mm) with metal pipe 

straps. Make sure the horizontal vent pipe is installed on 

a level horizontal plane.

X

FP1241

Fig. 50

  Horizontal length requirement.

Содержание 36CDVZRRN

Страница 1: ...ourneighbor sphone Follow the gas suppliers instructions If you cannot reach your gas supplier call the fire department WARNING IF THE INFORMATION IN THIS MANUAL IS NOT FOLLOWED E X A C T LY A F I R E...

Страница 2: ...tion Assembling Vent Pipes 12 36CDVZR Venting How to Use the Vent Graph 13 Rear Wall Venting Applications Installation Exterior outside wall 7 20 from rear of unit 13 Rear Wall Vent Installation Flex...

Страница 3: ...r wood panel extending the full width and depth of the fireplace 13 This fireplace requires adequate ventilation and combustion air to operate properly 14 Thisfireplacemustnotbeconnectedtoachimneyflue...

Страница 4: ...tally vented gas fueled heating appliance or equipment The sign shall read in print size no lessthanone half 1 2 inchinsize GASVENTDIRECTLY BELOW KEEP CLEAR OF ALL OBSTRUCTIONS Inspection The state or...

Страница 5: ...Gas Line Access Gas Line Access Low Voltage Electrical Access Electrical Access 33 838 mm C L Centerline of 7 Collar 856O 216 mm Low Voltage Access 1 6 35 mm 7 6 187 mm 856O 216 mm 3256 816 mm 14 356...

Страница 6: ...ccess Low Voltage Electrical Access Electrical Access 33 838 mm 856O 216 mm Low Voltage Access 1 6 35 mm 7 6 187 mm 856O 216 mm 3256 816 mm 14 356 mm 10175 CDVT specs 1 06 8 203 mm 2 9 5 6 7 4 0 m m 4...

Страница 7: ...01 sta Black Surround Face CFM170 DV Builder Front View O N M L K Side of Combustion Chamber CFM164a Mantel Mantel Leg FromSide Ref Leg Depth Ref of Comb Opening F 10 254 mm K 11 292 mm G 8 203 mm L...

Страница 8: ...s yields a 5 8 16 mm thick drywall space Removing the standoff and having the tabs on the standoff face the rear of the unit yields a 3 4 19 mm drywall space Fig 5 NOTE Drywall must stop at standoffs...

Страница 9: ...tallation and testing of any gas connection It is most convenient to bring the gas line in from the rear right side of the valve as this allows fan installation or removal without disconnecting the ga...

Страница 10: ...l Black and red are line voltage to each plug on the receptacle FP1597 Fig 9 Electric receptacle FP1597 receptacle install 12 05 OUTSIDE INSIDE BACK OF UNIT Electric Receptacle Electric Receptacle Cov...

Страница 11: ...let 3 91cm 3 91cm J Clearance to nonmechanical air supply inlet 6 15cm for appliances 10 000 6 15cm for appliances to building or the combustion air inlet to any Btuh 3kW 12 30cm for 10 000 Btuh 3kW 9...

Страница 12: ...x vent Hose Clamp Apply High Tempera ture Sealant FP1471a Fig 12 Apply high temperature sealant to 4 and 7 pipes Outside Corner Inside Corner Termination Clearances Termination clearances for building...

Страница 13: ...Exterior Outside Wall 7 178 mm to 20 508 mm From Rear of Unit With this application the following rigid pipe kits may be used 7 to 13 178 330 mm to outside wall 7TCRVT 13 to 20 330 305 mm to outside w...

Страница 14: ...rough the exterior wall and frame as shown Noncombustible Walls Fig 17 Hole opening must be 7 190 mm in diameter STEP 2 Install interior firestop as shown in Figure 18 STEP 3 Remove telescoping collar...

Страница 15: ...C L to Floor 2956O 749 mm Termination Flex Section Appliance Collars FP1473 Fig 20 Grasp the vent pipe close to the collar and bend to 45 angle Do not exceed 45 5 Insert the collar on the flex vent t...

Страница 16: ...mm off the floor 24Z x 622 mm 13 20 330 508 mm 3 Proceed with Step 3 of Rear Wall Vent Application Exterior Outside Wall 20 to 32 508 813 mm from Rear of Unit section below Rear Wall Vent Application...

Страница 17: ...means no vertical rise exists on this por tion of the vent assembly The maximum horizontal vent run is 20 ft 6 1 m when the vertical vent rise is 7 ft 2 3 m Fig 26 The maximum number of 90 elbows per...

Страница 18: ...gh tab into outer casing Fig 30 8 CFM143 2 2 01 sta Ensure Pipes are Concentric CFM143a Fig 30 Always start vertical run with 7TCDV90 on 36CDVR unts 7TCDV90 STEP 3 Measure the horizontal length requir...

Страница 19: ...ecommend a window well with adequate and proper drainage Ensure sidewall venting clearances are observed The maximum horizontal run with 24 vertical rise is 36 914 mm from the back of the fireplace to...

Страница 20: ...l runs Example Maximum horizontal length 0 x 45 elbows 10 3 m 1 x 45 elbows 8 2 6 m 2 x 45 elbows 7 2 1 m 3 A minimum of an 8 vertical rise 4 Two sets of 45 elbows offsets within these vertical instal...

Страница 21: ...nstallappropriatepipesectionsuntiltheventingisabove the flashing Fig 40 9 Install storm collar and seal around the pipe 10 Add additional vent lengths for proper height Fig 41 TWL101a Twist Lock Pipe...

Страница 22: ...ons for a Direct Vent flue system Vertical dimension from the floor of the unit to the center of the horizontal vent pipe 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 3...

Страница 23: ...se is 36 914 mm If a 90 elbow is used in the horizontal vent run level height maintained the maximum horizontal vent length is reduced by 36 914 mm This does not ap ply if the 90 elbows are used to in...

Страница 24: ...fixed andinstallthehorizontalventsections Thesectionswhich go through the wall are packaged with the starter kit and can be cut to suit if necessary Fig 48 Sealing the gaps between the vent pipe and...

Страница 25: ...the Sidewall Vent Graphforextendedhorizontalruniftheverticalriseexceeds 24 610 mm 1 Establish vent hole through the wall Page 14 Fig 17 2 Remove soil to a depth of approximately 16 406 mm below base...

Страница 26: ...1 x 45 elbows 8 2 6 m 2 x 45 elbows 7 2 1 m A minimum of an 8 2 4 m vertical rise Max 10 3m Max Height 40 12m Min Height 756O 2 3m FP1244 through the roof max min dims 12 02 Pipe Straps Every 3 914mm...

Страница 27: ...er height Fig 60 11 Apply high temperature sealant to 4 and 7 collars CFM110 Typical ceiling roof support 10 90 Typical Roof Support Application Typical Ceiling Sup port Application CFM110 Fig 58 Roof...

Страница 28: ...tthebottom lift the window frame assembly up and away from the fireplace 6 To replace the window frame assembly reverse the procedure Glass Cleaning It is necessary to periodically clean glass During...

Страница 29: ...er flames Compare them to the illustrations Figs 65 66 If the flame patterns appear abnormal contact a qualified service provider for service and adjustment Flame Characteristics L O H I FP390 FLAME A...

Страница 30: ...ese instructions exactly B BEFORE LIGHTING smell all around the heater area for gas Be sure to smell next to the floor because some gas is heavier than air and will settle on the floor WHAT TO DO IF Y...

Страница 31: ...air it call a qualified service technician Force or attempting repair may result in a fire or explosion D Do not use this appliance if any part has been under water Immediately call a qualified servic...

Страница 32: ...er wire across terminals at wall switch if burner comes on replace defective wall switch If okay jumper wires across wall switch wires at valve if burner comes on wires are faulty or connections are b...

Страница 33: ...FC111 Fig 70 Remove orifice from brass elbow AIR SHUTTER DJT Air Shutter Adjustment Screw LP Fully Open NG 1 8 Open FC112 Fig 71 Adjust air shutter 8 Install the new conversion orifice 9 Loosen the a...

Страница 34: ...place with conversion orifice 3 Install the enclosed identification label F to the valve body where it can be easily seen Testing for Leaks 1 Apply gas to the system and light the pilot 2 With a soapy...

Страница 35: ...ckup and cleaning and some may require adjustment If repair is necessary it should be performed by a qualified technician 1 Turn off pilot light at gas valve 2 Allow fireplace to cool if it has been o...

Страница 36: ...0012251 1b Log Middle Assy 20012108 2 Hood 20010312 3 Burner Tube 20010333 4 Orifice Burner Natural not shown 72386 5a Orifice Pilot Natural not shown 10002268 5b Orifice Pilot Propane not shown 10002...

Страница 37: ...Electrical Cord 6 ft 51865 18 Door Assy 20010207 19 Frame Window 20010320 20 Clamp Frame Window 10000949 21 Clean Face Panel 20014132 22 Valve Access Panel 20014134 23 Grommet 20010348 24 Wire Bushin...

Страница 38: ...DVP36 36 Vent Pipe 30 pack 7TDVP36 30 48 Vent Pipe 7TDVP48 48 Vent Pipe 30 pack 7TDVP48 30 Twist Lock Elbows 45 Elbow for Vertical Horizontal Offset 7TDV45 45 Elbow for Vertical Offsets 8 pack 7TDV45...

Страница 39: ...ble Vent Length 7TDVP3564 8 Vent Pipe 4 pack 7TDVP8 4 12 Vent Pipe 4 pack 7TDVP12 4 24 Vent Pipe 4 pack 7TDVP24 4 36 Vent Pipe 7TDVP36 36 Vent Pipe 30 pack 7TDVP36 30 48 Vent Pipe 7TDVP48 48 Vent Pipe...

Страница 40: ...T 4 4D24 3 6 36 Pipe Length galvanized 46DVA 36 903 4DT 36 4D36 3 6 48 Pipe Length galvanized 46DVA 48 902 4DT 48 4D48 4 6 81 2 Pipe Extension galvanized 46DVA 08A 4DT AJ 4 6 16 Pipe Extension galvani...

Страница 41: ...the strips to the metal panels No further securing is required 3 Powertothefancanbesuppliedbypluggingthesupplied lead into a conveniently located wall socket or by using the receptacle in the bottom...

Страница 42: ...42 CDVZ Series Direct Vent Gas Fireplace 20014621...

Страница 43: ...he installation instructions The Limited Lifetime Warranty will also be void if the appliance is not operated and maintained according to the operating instructions supplied with the appliance and doe...

Страница 44: ...63 36CDVZRRP 66 9 77 78 63 36CDVZTRN 57 76 76 5 63 36CDVZTRP 57 77 78 63 Based on CSA P 4 1 09 Based on CSA P 4 1 09 Recherchez dans la brochure les caract ristique de rendement nerg tique de foyer au...

Отзывы: