Fig. 38
Place firestop spacer(s) and secure.
If there is room above ceiling level, firestop
spacer must be installed on both the bottom
and the top side of the ceiling joists. If an attic
is above ceiling level a 7DVAIS (Attic Insulation
Shield) must be installed. (Fig. 38)
8. Install appropriate pipe sections until the venting is above
the flashing. (Fig. 40)
9. Install storm collar and seal around the pipe.
10. Add additional vent lengths for proper height. (Fig
41)
TWL101a
Twist Lock Pipe
2/8/99 djt
3 #5 Sheet Metal
Screws per Joint
Storm Collar
TWL101a
Fig. 40
Roof flashing.
Sealant
FP1022
Typical Straight Up Installation
1/26/00 djt
50’
(15 m)
Storm Collar
Roof Flash-
ing
Vent
Termination
Roof
2’ Min.
Roof Support
Attic Insulation
Shield
Attic
Insulation
Joists
Joists
FP1022
Fig. 39
Typical straight-up installation.
Min.
2' (610 mm)
FP1185
Fig. 41
Minimum termination to roof clearance.
The enlarged ends of the vent section always