
ME150 - Installation and Operation Manual
17
4.
Every time the chimney passes through a ceiling or a wall, install the appropriate firestop. When you
reach the desired height, install the roof support (not illustrated). (Refer to instructions included with
the support).
5.
Then, put the roof flashing (E) in place and seal the joint between the roof and the flashing with roofing
pitch. For sloping roofs, place the flashing under the upper shingles and on top of the lower shingles.
Nail the flashing to the roof, using roofing nails.
6.
Place the storm collar (F) over the flashing, and tighten it with the bolt supplied. Finally, seal the joint
between the storm collar and the chimney, using silicone caulking.
7.
Install the chimney cap (G).
8.
When a ventilated roof flashing is installed, precautions are to be taken not to caulk or seal the
ventilating openings.
**
THE STRUCTURAL INTEGRITY OF THE FLOOR, WALL, AND CEILING/ROOF MUST BE MAINTAINED
NOTE: THE FLOOR AND WALLS BELOW THE ATTIC MUST BE INSULATED USING THE SAME INSULATION.
Содержание ME150
Страница 5: ...ME150 Installation and Operation Manual 5 1 2 Views with measurements ...
Страница 9: ...ME150 Installation and Operation Manual 9 ...
Страница 13: ...ME150 Installation and Operation Manual 13 18 457 21mm 18 457 2mm 16 406 4mm 16 406 4mm 18 457 2mm ...
Страница 15: ...ME150 Installation and Operation Manual 15 Direct installation Exterior offset installation ...
Страница 21: ...ME150 Installation and Operation Manual 21 Chimney Enclosure Canada and U S Chimney Enclosure Canada only ...
Страница 24: ...24 ME150 Installation and Operation Manual ...
Страница 28: ...28 ME150 Installation and Operation Manual PL60004 ...
Страница 30: ...30 ME150 Installation and Operation Manual 7 1 Exploded view for replacement parts ...