![Ventis ME150 Скачать руководство пользователя страница 16](http://html.mh-extra.com/html/ventis/me150/me150_installation-and-operation-manual_1002237016.webp)
16
ME150 - Installation and Operation Manual
Interior offset installation
1.
Cut and frame the holes in the ceiling, floor and roof where the chimney will pass. Use a plumb bob to
line up the center of the holes. Make sure that the size of the floor and ceiling holes are in accordance
with the chimney manufacturer’s instructions.
2.
From below, install a firestop (B) supplied by the chimney manufacturer in each ceiling/floor separation
through which the chimney will pass. At the attic level, install a radiation shield from above (D).
3.
Follow the chimney’s manufacturers’ instructions and place the first chimney length on the fireplace.
You must use an anchor plate (A) supplied by the chimney manufacturer before installing the first
chimney length. Continue installing chimney lengths making sure to secure each length in place with 3
screws.
Содержание ME150
Страница 5: ...ME150 Installation and Operation Manual 5 1 2 Views with measurements ...
Страница 9: ...ME150 Installation and Operation Manual 9 ...
Страница 13: ...ME150 Installation and Operation Manual 13 18 457 21mm 18 457 2mm 16 406 4mm 16 406 4mm 18 457 2mm ...
Страница 15: ...ME150 Installation and Operation Manual 15 Direct installation Exterior offset installation ...
Страница 21: ...ME150 Installation and Operation Manual 21 Chimney Enclosure Canada and U S Chimney Enclosure Canada only ...
Страница 24: ...24 ME150 Installation and Operation Manual ...
Страница 28: ...28 ME150 Installation and Operation Manual PL60004 ...
Страница 30: ...30 ME150 Installation and Operation Manual 7 1 Exploded view for replacement parts ...