3
Initial Setup
Buffing Solution Tubing:
To ensure the optimal quality of your VMI Hybrid, this unit
has been fully Quality Controlled, prior to leaving our facilities. Due to this, some
Buffing Solution was been run through the machine. For shipping purposes we
have filled the Buffing Solution Tubing with a mixture of water and alcohol, which
has been capped off on both ends. The following is a step by step sequence for
removing this shipping mixture:
Plug in the Power Cord to a wall outlet.
1.
Turn on power to the unit by pressing the ON/OFF switch, located on the back
2.
of the machine, to the ON position.
Upon powering up, the Top Cover will automatically open.
3.
Locate the two Caps which cover the two Jet
4.
Nozzles on the inside of the Top Cover.
Remove these Caps. (PLEASE SAVE THESE
5.
CAPS!)
Located on the front of the VMI Hybrid is the
6.
User Keypad. On this keypad, towards the
right hand side, are two buttons labeled “C”
for Buffing Solution and “W” for Water. The
label entitled “Prep Line” will be found below
these two buttons.
To activate the Prepping Process, to purge the
7.
Buffing Solution line of the shipping mixture,
press the “C” button.
NOTE: Make sure to have
a napkin, paper towel, or small receptacle ready
to catch the draining liquid. Make sure not to
allow any liquid to drain directly onto the Main Motor spindle.
Once this process has been activated, locate the back end of the Buffing
8.
Solution Tubing, found on the back side of the machine.
On the back end of this tubing is another Cap. Remove this Cap. (PLEASE SAVE
9.
THIS CAP!)
Let this process run until all of the Shipping Mixture has been removed from
10.
the line.
For shipping purposes - the two bottles of Buffing Solution, the C-H Chip, the Center
Hubs, and the Buffing Pads have been separated from the unit. Please find these items
stored within the packing material.
SECTION 3
Initial Setup