29
MECHANICAL SHIFTING SETUP
1
SHIFT CABLE
CABLE NOODLE
SHIFT HOUSING
2
CABLE SHEATH
CABLE SHEATH
3
CABLE NOODLE
SHIFT HOUSING
TOP HAT
REAR DERAILLEUR CABLE
Fig.1:
Measure the length of housings needed for proper rotation of the stem/handlebar. It is recommended to
route the housings from the shifters to the down tube entry ports on the opposite sides of the frame.
Fig.1:
Install a shift cable noodle in each down tube entry port, then install the cable housings with 4mm ferrules.
Fig.2:
Guide the cables out the bottom bracket exit port. Make sure the cables cross themselves in the down
tube only once.
Fig.2:
Install a sheath on the cable, then route the rear shift cable through the bottom bracket cable guide, then
back into the chainstay until it exits at the drive-side rear dropout (fig.3).
Fig.2:
Install a sheath on the cable, then route the front shift cable through the bottom bracket cable guide and
up the guide extension, then through the frame until it exits above the bottom bracket.
Fig.3:
Install a Top Hat over the cable and into the dropout, followed by a shift cable noodle and a section of rear
cable housing with 4mm ferrule.
ELECTRONIC SHIFTING SETUP
1
ELECTRONIC
SHIFT WIRE
ELECTRONIC
SHIFT WIRE
SHIFT PORT
PLUG
2
WIRE GROMMET
REAR DERAILLEUR
WIRE
Install the shift wire into the down tube entry port BEFORE installing the rear brake housing.
Route the wiring inside the frame and to the derailleurs/battery the same way as for a ViAS setup (
see section 3.
Frame Assembly, page 15
), except the wire exits the frame from the down tube port instead of up the head
tube and through the stem.
Содержание VIAS
Страница 1: ...USER MANUAL...
Страница 2: ......
Страница 33: ......
Страница 34: ......
Страница 35: ......
Страница 36: ...SPECIALIZED BICYCLE COMPONENTS 15130 Concord Circle Morgan Hill CA 95037 408 779 6229...