Cabling Instructions
The following figure provides detailed information about an individual beacon’s pass-through
cables and direct power and data connectors. The pass-through cables on a lower beacon are
designed to mate directly with the power input and data input connectors of an upper beacon.
Extension power and data cables are provided for both beacons to connect to external power
sources and other equipment. These extension cables connect to the lower beacon directly and to
the upper beacon via the lower beacon’s pass-through cables. The extension cables are left
unterminated for customer use.
Making the Final Connections:
All cables feed out of the bottom beacon base assembly.
• Bottom Unit connections are labelled:
1.
“Power +24V/+12V”
2.
“Power 0V”
3. Data Connector on the bottom plate boss
• Top Unit connections are labelled:
1.
“Carry Through Power +24V/+12V”
2.
“Carry Through Power 0V”
3.
“Carry Through Data”