OTDR Series
e-Manual, D07-00-
076P
-RevD00
Page 84 of 109
Deleting events:
1. Select the event in the Event table or by using the marker on the trace.
2. Use the left/right arrows to position the marker more accurately, if needed.
3. Once selected, press the
Delete
button on the right sidebar. The event will now be deleted
from the event table and the event number will no longer appear on the trace.
Modifying events:
1. Ensure the Trace menu is active and the Event table is shown on the screen.
2. Use the left/right arrows to highlight the necessary event in the Event Table. Press the
Modify
button on the right sidebar. A marker with two small markers will appear on the
trace. When markers and measurement is performed, click the
Accept
button on the right
sidebar.
•
Span Begin
– Position marker at end of the Launch fiber and press the green
Span
Begin
button to set the beginning of fiber under test.
•
Span End
- Position marker at end of the fiber under test and press the green
Span
End
(if launch box is used).
•
Markers
- Brings marker onto the visible area of the display.
•
Modify
- Changes the display to allow the user to make manual adjustments to the
event table and reanalyze.
Содержание OTDR FX150+ Series
Страница 1: ...OTDR Series e Manual D07 00 076P RevD00 Page 1 of 109...
Страница 13: ...OTDR Series e Manual D07 00 076P RevD00 Page 13 of 109 TX300s Top View RxT 4100 OTDR Module...
Страница 16: ...OTDR Series e Manual D07 00 076P RevD00 Page 16 of 109 5 3 MTTplus Overview 5 3 1 MTTplus Side View...
Страница 18: ...OTDR Series e Manual D07 00 076P RevD00 Page 18 of 109 5 4 RXT Overview...
Страница 50: ...OTDR Series e Manual D07 00 076P RevD00 Page 50 of 109 Analysis Report pdf format...
Страница 97: ...OTDR Series e Manual D07 00 076P RevD00 Page 97 of 109 MTTplus Manual Save Image added to results...