10
CSLD Troubleshooting
CSLD Diagnostic Aids
10-6
Figure 10-4.
CSLD Rate Test Example
IA5200
MAR 14, 1996 8:12 AM
CSLD DIAGNOSTICS: RATE TEST
TK DATE LRATE INTVL ST AVLRTE VOL C1 C3 FDBK ACPT THPUT EVAP RJT
1 9603140346 -0.031 33.7 1 0.002 3525 74 15 38.3 28.9 31.63 0.000 0
2 9603140342 0.000 32.2 1 0.004 3184 74 15 38.3 28.9 29.85 0.000 0
3 9603140151 0.051 26.8 1 0.039 6165 49 16 10.1 8.8 43.67 0.000 0
4 9603140646 -0.000 53.0 1 -0.003 1762 80 26 45.0 44.8 20.22 0.000 0
DATE The date of the last rate table evaluation (YYDDMMHHMM)
LRATE Compensated leak rate in gph (negative number = a loss, no sign = a gain)
INTVL Total test duration, sum of all acceptable tests, in hours.
ST Status:
0 NO TEST - no evaluation.
1 PASS
2 FAIL
3 NOT USED.
4 INVALID - obsolete.
5 NO DATA:COUNT - not enough tests available to evaluate. There must be
at least 2 acceptable tests.
6 NO DATA:INTERVAL - not enough total test time to evaluate (< 6 hours).
7 NO DATA:RANGE - tests did not range over a sufficient time period.
test time < 10 hours AND tests date range < 5 DAYS.
8 WARNING INCREASE - excessive positive leak rate.
9 WARNING NEGATIVE_HOLD - 2 day waiting period before reporting a
failure.
AVLRTE Uncompensated Leak Rate, in gph (negative number = a loss, no sign = a gain)
VOL Average volume of all acceptable tests.
C1 Total number of tests in the rate table.
C3 Number of acceptable tests.
FDBK Feedback control variable, range 0 to 45 minutes.
ACPT Accept control variable, range 0 to 45 minutes.
THPUT Estimated monthly throughput in thousands of gallons.
EVAP If the Reid Vapor Pressure table has been entered, the evaporation rate will
be here.
RJT Of the last 20 tests completed, this is the number of tests rejected due
to excessive positive leak rate (>0.4 gph).