10-25
10
CSLD Troubleshooting
Actual CSLD Test Problems Analyzed
I25100
JUN 17, 1998 8:32 AM
Station Header 1
Station Header 2
Station Header 3
Station Header 4
CSLD TEST RESULTS
TANK PRODUCT RESULT
1 UNLEADED SOUTH PER: JUN 17, 1998 FAIL
2 UNLEADED NORTH PER: JUN 17, 1998 PASS
3 POWER PREMIUM PER: JUN 17, 1998 PASS
4 POWER PLUS PER: JUN 17, 1998 PASS
IA5200
JUN 17, 1998 8:32 AM
CSLD DIAGNOSTICS: RATE TEST
TK DATE LRATE INTVL ST AVLRTE VOL C1 C3 FDBK ACPT THPUT DFMUL RJT
1 9806170430 -0.492 14.7 2 -0.504 6123 26 20 0.0 0.0 7.13 0.61 0
2 9806170254 0.025 14.8 1 0.015 6238 22 19 0.0 0.0 6.89 0.67 9
3 9806170557 0.033 22.3 1 0.025 6289 75 19 39.4 29.8 4.01 0.14 0
4 9806170527 0.033 26.6 1 0.018 6010 44 21 4.5 4.2 6.74 0.08 1
I61200
JUN 17, 1998 8:33 AM
TANK MANIFOLDED PARTNERS
TANK PRODUCT LABEL MANIFOLDED TANKS
1 UNLEADED SOUTH NONE
2 UNLEADED NORTH NONE
3 POWER PREMIUM NONE
4 POWER PLUS NONE
Tanks programmed as
manifolded would have
a common result.
Positive tests rejected,
these occurred when
T1 was filing this tank.
Tanks not programmed
as manifolded.