4. Installing the Equipment: Base Stand (Optional)
66
vatech A9 (Model:PHT-30CSS)
Installation Manual
Leveling the Front and Back
1. Place the Spirit Level vertically, as shown in the image.
2. Turn Screws in marked locations left and right until the Sprit Level bubble comes
to the center.
3. When leveling the equipment is completed, ensure to tighten all eight Screws
until they no longer move.
Содержание PHT-30CSS
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 10: ......
Страница 20: ...1 Introduction 10 vatech A9 Model PHT 30CSS Installation Manual This page is intentionally left blank...
Страница 41: ...3 Before Installing the System vatech A9 Model PHT 30CSS Installation Manual 31 English CEPH Box Configuration...
Страница 43: ...3 Before Installing the System vatech A9 Model PHT 30CSS Installation Manual 33 English Transportation Example...
Страница 109: ...7 Setting up PC vatech A9 Model PHT 30CSS Installation Manual 99 English This page is intentionally left blank...
Страница 148: ......
Страница 150: ...Appendix A 2 vatech A9 PHT 30CSS Installation Manual Schematic Diagram Components Supplied...
Страница 162: ......