4. Installing the Equipment: Base Stand (Optional)
vatech A9 (Model: PHT-30CSS)
Installation Manual
57
En
gli
sh
2. Drill the floor holes of size 12 mm x 30 mm (depth) using the concrete hammer
drill.
3. Remove the debris and clean the holes using the dust pump.
4. Remove nuts and washers, put the anchor bolts into the holes.
5. Secure the anchor bolts with the hammer.
Содержание PHT-30CSS
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 10: ......
Страница 20: ...1 Introduction 10 vatech A9 Model PHT 30CSS Installation Manual This page is intentionally left blank...
Страница 41: ...3 Before Installing the System vatech A9 Model PHT 30CSS Installation Manual 31 English CEPH Box Configuration...
Страница 43: ...3 Before Installing the System vatech A9 Model PHT 30CSS Installation Manual 33 English Transportation Example...
Страница 109: ...7 Setting up PC vatech A9 Model PHT 30CSS Installation Manual 99 English This page is intentionally left blank...
Страница 148: ......
Страница 150: ...Appendix A 2 vatech A9 PHT 30CSS Installation Manual Schematic Diagram Components Supplied...
Страница 162: ......