4. Installing the Equipment: Base Stand (Optional)
vatech A9 (Model: PHT-30CSS)
Installation Manual
53
En
gli
sh
Drilling on the Wall
1. Drill the wall holes of size 10.5 mm x 30 mm (depth) using the concrete hammer
drill.
2. Remove the debris and clean the holes using the dust pump.
3. Using the hammer, insert a Ficher strong anchor into the hole.
Required Tool
Hammer
N/A
Parts and
Accessory
Flat Anchor Bolt
M8 x 30
(Part. No. 34) - 4
pcs
4.
Using the hammer, insert an EHS tool into the inner bolt.
Required Tool
Hammer
N/A
Parts and
Accessory
EHS tool
EAW H
8x30
Содержание PHT-30CSS
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 10: ......
Страница 20: ...1 Introduction 10 vatech A9 Model PHT 30CSS Installation Manual This page is intentionally left blank...
Страница 41: ...3 Before Installing the System vatech A9 Model PHT 30CSS Installation Manual 31 English CEPH Box Configuration...
Страница 43: ...3 Before Installing the System vatech A9 Model PHT 30CSS Installation Manual 33 English Transportation Example...
Страница 109: ...7 Setting up PC vatech A9 Model PHT 30CSS Installation Manual 99 English This page is intentionally left blank...
Страница 148: ......
Страница 150: ...Appendix A 2 vatech A9 PHT 30CSS Installation Manual Schematic Diagram Components Supplied...
Страница 162: ......