5. Installing the Equipment: Wall Mount
72
vatech A9 (Model:PHT-30CSS)
Installation Manual
3. Place the equipment over the Alignment Plate to insert each Anchor Bolt into a
corresponding hole on the Column Bottom.
4. Place the washers and nuts on Anchor Bolts. Tighten each nut loosely with a
fastener.
DO NOT tighten the nuts until the leveling is completed.
While one installer tightens the nuts, the other installers
should hold the middle handle to prevent the equipment
from falling.
Содержание PHT-30CSS
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 10: ......
Страница 20: ...1 Introduction 10 vatech A9 Model PHT 30CSS Installation Manual This page is intentionally left blank...
Страница 41: ...3 Before Installing the System vatech A9 Model PHT 30CSS Installation Manual 31 English CEPH Box Configuration...
Страница 43: ...3 Before Installing the System vatech A9 Model PHT 30CSS Installation Manual 33 English Transportation Example...
Страница 109: ...7 Setting up PC vatech A9 Model PHT 30CSS Installation Manual 99 English This page is intentionally left blank...
Страница 148: ......
Страница 150: ...Appendix A 2 vatech A9 PHT 30CSS Installation Manual Schematic Diagram Components Supplied...
Страница 162: ......