4. Installing the Equipment: Base Stand (Optional)
56
vatech A9 (Model:PHT-30CSS)
Installation Manual
4.4
Fixing the Base (Optional)
Concrete Floor
Required Tool
Hammer Drill
L = 200 mm
(7+-.9”)
Ratchet Wrench
Tips: 3 mm - 8 mm
(0.12” - 0.3”)
Hammer
N/A
Parts and
Accessory
Anchor Bolt
5/16 x 60 w/ Spring
and Flat Washers -
2 pcs
(Part No. 34)
Spring washer
M8 - 2 pcs
(Part No. 34)
1. Place the Base Unit on the floor where you planned to install the equipment.
And mark two locations to insert anchor bolts. (
see below)
Содержание PHT-30CSS
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 10: ......
Страница 20: ...1 Introduction 10 vatech A9 Model PHT 30CSS Installation Manual This page is intentionally left blank...
Страница 41: ...3 Before Installing the System vatech A9 Model PHT 30CSS Installation Manual 31 English CEPH Box Configuration...
Страница 43: ...3 Before Installing the System vatech A9 Model PHT 30CSS Installation Manual 33 English Transportation Example...
Страница 109: ...7 Setting up PC vatech A9 Model PHT 30CSS Installation Manual 99 English This page is intentionally left blank...
Страница 148: ......
Страница 150: ...Appendix A 2 vatech A9 PHT 30CSS Installation Manual Schematic Diagram Components Supplied...
Страница 162: ......