1. Introduction
Green 16/18 Installation Manual 1
En
glis
h
1. Introduction
1.1
Customer’s Responsibility
Site planning and preparation are the responsibility of the customer. The following
points should be considered fundamentally important to all customers of this product:
Install all required materials before delivery of the system.
Complete the floor, ceiling, and walls of the room before installing the equipment.
Install proper sized junction boxes, with covers, at the necessary locations.
Install a mains power with the proper voltage output and an adequate kVA rating.
Install the circuit breaker specified by this manual.
Provide the installer(s) with the current dimensions of the room, including the
hallway and entry door sizes.
The customer must have an electrician install more than two power outlets in the
room.
Содержание Green 16
Страница 1: ...Installation Manual Model PHT 65LHS Version 1 49 English Full Version...
Страница 2: ......
Страница 8: ......
Страница 22: ...2 Choosing an Installation Site 14 Green 16 18 Installation Manual Ceiling Height 2 435 5 mm H or higher...
Страница 31: ...2 Choosing an Installation Site Green 16 18 Installation Manual 23 English This Page Intentionally Left Blank...
Страница 51: ...3 Before Installing the System Green 16 18 Installation Manual 43 English This Page Intentionally Left Blank...
Страница 92: ...5 Installing the Equipment Wall Mount 84 Green 16 18 Installation Manual This Page Intentionally Left Blank...
Страница 111: ...8 Setting Up PC Environment Variables Green 16 18 Installation Manual 103 English This Page Intentionally Left Blank...
Страница 145: ...Appendix Green16 18 Installation Manual 137 English Schematic Diagram Components Supplied...
Страница 159: ...Appendix Green16 18 Installation Manual 151 English This page intentionally left blank...
Страница 160: ......
Страница 162: ...Postal Code 18449 13 Samsung 1 ro 2 gil Hwaseong si Gyeonggi do Korea www vatech com...