3. Before Installing the System
Green 16/18 Installation Manual 39
En
glis
h
Part
No.
Items
Specification
Figure
QTY
Comments
Confirmed
(OK?)
18
Left Blank Intentionally
19
Left Blank Intentionally
20
Cable Tie
10
Yes
□
No
□
21
Frame
Grabber
System
Optic Cable
1
One
additional
fiber optic
cable is
required
when SC
type is
installed
Yes
□
No
□
LAN Cable
1
Yes
□
No
□
IFC Card
(or)
FTG Card
(or)
VTG Card
1
Yes
□
No
□
MODEL Scan
Jig
1
For the 3D
MODEL
Scan model
Yes
□
No
□
22
Column
Bracket
1
Yes
□
No
□
23
Wrench Bolt
M10 x 25
w/ Spring and
Flat Washers
6
Base Option
Yes
□
No
□
24
Wrench Bolt
M8 x 45
2
Base Option
Yes
□
No
□
25
Wrench Bolt
M8 x 20
4
Yes
□
No
□
Spring Washer
4
Yes
□
No
□
C_E_Washer
4
Yes
□
No
□
Содержание Green 16
Страница 1: ...Installation Manual Model PHT 65LHS Version 1 49 English Full Version...
Страница 2: ......
Страница 8: ......
Страница 22: ...2 Choosing an Installation Site 14 Green 16 18 Installation Manual Ceiling Height 2 435 5 mm H or higher...
Страница 31: ...2 Choosing an Installation Site Green 16 18 Installation Manual 23 English This Page Intentionally Left Blank...
Страница 51: ...3 Before Installing the System Green 16 18 Installation Manual 43 English This Page Intentionally Left Blank...
Страница 92: ...5 Installing the Equipment Wall Mount 84 Green 16 18 Installation Manual This Page Intentionally Left Blank...
Страница 111: ...8 Setting Up PC Environment Variables Green 16 18 Installation Manual 103 English This Page Intentionally Left Blank...
Страница 145: ...Appendix Green16 18 Installation Manual 137 English Schematic Diagram Components Supplied...
Страница 159: ...Appendix Green16 18 Installation Manual 151 English This page intentionally left blank...
Страница 160: ......
Страница 162: ...Postal Code 18449 13 Samsung 1 ro 2 gil Hwaseong si Gyeonggi do Korea www vatech com...