4. Installing the Equipment: Base Stand (Optional)
44
Green 16/18 Installation Manual
4. Installing the Equipment: Base Stand
(Optional)
4.1
Assembling the Base and Main Units
If the installation site is a concrete floor, go to section
4.4
Fixing the base (Optional)
and do number
1
first; after that,
turn back
4.1 Assembling the Base and Main Units
.
1. Remove the lower carrying handle.
Allen Wrench
6 mm / 0.24”
2. Put two wrench bolts into the holes on the bottom of the column unit.
Allen Wrench
6 mm / 0.24”
Wrench Bolt
M8 x 45
- 2 pcs
(Part No. 24)
Содержание Green 16
Страница 1: ...Installation Manual Model PHT 65LHS Version 1 49 English Full Version...
Страница 2: ......
Страница 8: ......
Страница 22: ...2 Choosing an Installation Site 14 Green 16 18 Installation Manual Ceiling Height 2 435 5 mm H or higher...
Страница 31: ...2 Choosing an Installation Site Green 16 18 Installation Manual 23 English This Page Intentionally Left Blank...
Страница 51: ...3 Before Installing the System Green 16 18 Installation Manual 43 English This Page Intentionally Left Blank...
Страница 92: ...5 Installing the Equipment Wall Mount 84 Green 16 18 Installation Manual This Page Intentionally Left Blank...
Страница 111: ...8 Setting Up PC Environment Variables Green 16 18 Installation Manual 103 English This Page Intentionally Left Blank...
Страница 145: ...Appendix Green16 18 Installation Manual 137 English Schematic Diagram Components Supplied...
Страница 159: ...Appendix Green16 18 Installation Manual 151 English This page intentionally left blank...
Страница 160: ......
Страница 162: ...Postal Code 18449 13 Samsung 1 ro 2 gil Hwaseong si Gyeonggi do Korea www vatech com...