5. Installing the Equipment: Wall Mount
Green 16/18 Installation Manual 81
En
glis
h
5.6
Leveling the Equipment
T-shaped Hex
Wench
8 mm / 0.3”
Sprit Level
n/a
Ensure that the Spirit Level should rest only on the
locations indicated in the following figures to obtain the
accurate center.
1. Prepare the Spirit Level.
2. Turn the Rotating Unit clockwise so that the X-ray tube head faces the front, as
shown in the figure.
3. Put the set screws into the four holes and turn them clockwise with the hex wrench
until they touch the aligning plate.
T-shaped Hex
Wench
8 mm / 0.3”
Set Screw
M10 x 20 – 4
pcs
(
Part No. 30)
Содержание Green 16
Страница 1: ...Installation Manual Model PHT 65LHS Version 1 49 English Full Version...
Страница 2: ......
Страница 8: ......
Страница 22: ...2 Choosing an Installation Site 14 Green 16 18 Installation Manual Ceiling Height 2 435 5 mm H or higher...
Страница 31: ...2 Choosing an Installation Site Green 16 18 Installation Manual 23 English This Page Intentionally Left Blank...
Страница 51: ...3 Before Installing the System Green 16 18 Installation Manual 43 English This Page Intentionally Left Blank...
Страница 92: ...5 Installing the Equipment Wall Mount 84 Green 16 18 Installation Manual This Page Intentionally Left Blank...
Страница 111: ...8 Setting Up PC Environment Variables Green 16 18 Installation Manual 103 English This Page Intentionally Left Blank...
Страница 145: ...Appendix Green16 18 Installation Manual 137 English Schematic Diagram Components Supplied...
Страница 159: ...Appendix Green16 18 Installation Manual 151 English This page intentionally left blank...
Страница 160: ......
Страница 162: ...Postal Code 18449 13 Samsung 1 ro 2 gil Hwaseong si Gyeonggi do Korea www vatech com...