5. Installing the Equipment: Wall Mount
Green 16/18 Installation Manual 71
En
glis
h
5.1.2 Drilling the Floor
1. Remove the aligning plate.
2. Drill the floor holes (size: 10.5 x 30 mm) by using the concrete hammer drill.
3. Remove the debris and clean the holes with the dust pump.
4. Put the anchor bolts into the holes and attach them with the hammer. Verify that
the anchors are secured.
Anchor Bolt
5/16 x 60 w/ Spring and Flat Washers
2 pcs
(Part No. 34)
Hammer Drill
L = 200 mm (7.9”)
Содержание Green 16
Страница 1: ...Installation Manual Model PHT 65LHS Version 1 49 English Full Version...
Страница 2: ......
Страница 8: ......
Страница 22: ...2 Choosing an Installation Site 14 Green 16 18 Installation Manual Ceiling Height 2 435 5 mm H or higher...
Страница 31: ...2 Choosing an Installation Site Green 16 18 Installation Manual 23 English This Page Intentionally Left Blank...
Страница 51: ...3 Before Installing the System Green 16 18 Installation Manual 43 English This Page Intentionally Left Blank...
Страница 92: ...5 Installing the Equipment Wall Mount 84 Green 16 18 Installation Manual This Page Intentionally Left Blank...
Страница 111: ...8 Setting Up PC Environment Variables Green 16 18 Installation Manual 103 English This Page Intentionally Left Blank...
Страница 145: ...Appendix Green16 18 Installation Manual 137 English Schematic Diagram Components Supplied...
Страница 159: ...Appendix Green16 18 Installation Manual 151 English This page intentionally left blank...
Страница 160: ......
Страница 162: ...Postal Code 18449 13 Samsung 1 ro 2 gil Hwaseong si Gyeonggi do Korea www vatech com...